Loading...
HomeMy WebLinkAbout0130654-Building (city rehab)r~ OSHKOSH ON THE WATER Job Address 1321 PUNHOQUA ST Designer Category 141 -Exterior Remode CITY OF OSHKOSH No 130654 BUILDING PERMIT -APPLICATION AND RECORD Owner RICHARD C JONES Create Date 06/06/2008 Contractor PEPPLER REMODELING Plan Type ~ Building ~ Sign ~ Canopy ~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Finished/Living Sq. Ft. Bedrooms Garage Sq. Ft. Baths Foundation ~ Poured Concrete ~ Floating Slab 0 Pier Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work / New roof on house, replace-deteriorated soffit/fascia, new patio door, and new vinyl windows (same size and location). rear deck, kitchen flooring HVAC Contractor Electric Contractor Fees: Valuation Issued By: Height Ft. ^ Projection Stories Canopies Signs Other Plumbing Contractor $11,000.00 Plan Approval $0.00 Permit Fee Paid ^ Permit Voided $94.00 Park Dedication $0.00 Date 06/18/2008 Final/O.P. 00/00/0000 Parcelld # 1600230000 In the pertormance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh h no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit a i tion within easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ~ n sary p v before starting such activity. I have read and unde nd ore do information. ~ /~ Signature ~ Date Agent/Owner Address W2380 COUNTY O BERLIN WI 54923 - 0000 Telephone Number 920-361-7731 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.