HomeMy WebLinkAbout0130654-Building (city rehab)r~
OSHKOSH
ON THE WATER
Job Address 1321 PUNHOQUA ST
Designer
Category 141 -Exterior Remode
CITY OF OSHKOSH No 130654
BUILDING PERMIT -APPLICATION AND RECORD
Owner RICHARD C JONES Create Date 06/06/2008
Contractor PEPPLER REMODELING
Plan
Type ~ Building ~ Sign ~ Canopy ~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement Sq. Ft. Rooms
Finished/Living Sq. Ft. Bedrooms
Garage Sq. Ft. Baths
Foundation ~ Poured Concrete ~ Floating Slab 0 Pier
Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature
of Work
/ New roof on house, replace-deteriorated soffit/fascia, new
patio door, and new vinyl windows (same size and location).
rear deck, kitchen flooring
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Height Ft. ^ Projection
Stories Canopies
Signs
Other
Plumbing Contractor
$11,000.00 Plan Approval $0.00 Permit Fee Paid
^ Permit Voided
$94.00 Park Dedication $0.00
Date 06/18/2008 Final/O.P. 00/00/0000
Parcelld # 1600230000
In the pertormance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh h no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit a i tion within easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure ~ n sary p v before starting such activity.
I have read and unde nd ore do information. ~ /~
Signature ~ Date
Agent/Owner
Address W2380 COUNTY O BERLIN WI 54923 - 0000 Telephone Number 920-361-7731
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.