HomeMy WebLinkAboutPlumbing B5-983 (9/6/1983)CITT
Of
OSHKOSH
Sept. 6, 1983
Les Smith Plumbing & Heating
1350 Bismark Ave.
Oshkosh, WI 54901
RE: Plumbing Plan Approval for
Jossl n St.
Plan ID B 83
Gentlemen:
Examination of the plumbing plans
project has been completed.
specifications for the abovementioned
In accord with Chapter 145, Wisconsin Statutes, and Chapter H62, Wisconsin
Administrative Code, the plumbing plans and specifications are approved
contingent upon compliance with the stipulation noted below:
1) Plumbing Plan is in reasonable compliance with state and local
plumbing regulations.
The architect, professional engineer, registered designer, owner or plumbing
contractor shall keep, at the construction site, one set of plans bearing the
stamp of approval.
In the event installation of this plumbing system has not commenced within
two years from this date, this approval shall become void. Anew application
accompanied by full examination fee shall be filed and an updated approval
received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not
hold itself liable for any defects in plans or specification, plan omissions,
examination oversight, construction or any damage that may result in or after
installation and reserves the right to order changes or additions should
conditions arise making this necessary.
It shall be necessary for installingplumber to obtain a plumbing permit from
the City of Oshkosh before proceeding with actual installation of this plumbing
system or any of its parts.
Sincerely,
MARVIN HIGLEY
Plumbing Supervisor
t
:~i:mr
P. O. BOX 1130 • OSHKOSH, WISCONSIN 54902