Loading...
HomeMy WebLinkAbout0130405-Plumbing (disposal)OSHKOSH ON THE WATER Job Address 1613 COVINGTON DR Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By i ', CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND .RECORD Owner JOYCE BROWN Shower Water Softner Floor Drain Local Waste Lndry Tray Clothes Wshr Disposal 1 Bidet Dishwasher Beer Tap Sump Pump Lab Sink Classrm Sink Sterilizer Breakrm Sink Dip Well Ejector/Grind Drink Ftn dace disposal. "DEBIT ACCT'*. No 130405 Create Date 06/05/2008 Category 410 -Residential-Interior Plan Wait. St. Shamp Sink Coffee Maker ~ Ice Chest Flr/Vllst Sink Int Grease Trap Exam Sink ,Catch Basin Ext Grease Trap Sculry Sink Wash Ftn RPZ Valve j Hand Sink Urinal Eye Wash Statn ~ Plaster Sink Standp Rec .Wtr Sewer Mtrs Surgeons Sink •Ice Maker Deduct Meters ~ F Prep Sink Gar Drain Wtr Usage Mtrs j Serv Sink I I Soda Disp Size Material Type # Conn. Type Sanitary Sewer i Storm Sewer Water Service i $500.00 Plan Approval $0.00 ~ permit Fees $25.00 ^ Permit Voided ~~~ In the pertormance of this work, I agree to pertorm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pertomt the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ; Date Parcel Id # 1317260000 Date 06/06/2008 Address 522 W. MURDOCK AVE OSHKOSH ~ _ WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.