Loading...
HomeMy WebLinkAbout0130416-Plumbing (water heater)r -1 OSHKOSH ON THE WATER Job Address 648 BROAD ST Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD Owner LOUELLA J CHOUINARD 411 -Residential-Water Heaters Bathtub Shower Whirlpool Floor Drain Lavatory Lndry Tray Toilet Disposal Res. Sink Dishwasher Bar Sink Sump Pump Water Heater 1 Ciassrm Sink Site Drain Breakrm Sink Roof Drain Ejector/Grind Misc. Fixtures Use/Nature ~SFR /Replace gas water of Work No 130416 Create Date 06/05/2008 Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste - Ice Chest - FIrlVlfst Sink Int Grease Trap -- Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet i~ Scuiry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs --- _ Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well ~ F Prep Sink Gar Drain Wtr Usage Mtrs Drinkftn ~ Serv Sink :..Soda Disp DEBIT ACCT**. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 0405710000 Valuation $500.00 Plan Approval $0.00 'Permit Fees $25.00 ^ Permit Voided Issued By ~ (/'0 In the performance of this work, I agree to perform all work pursuai While the City of Oshkosh has no authority to enforce easement n described in this permit application within an easement, the City sU easement holder(s) and to secure any necessary approvals before Signature to rules governing the described construction. frictions of which it is not a party, if you perform the work igly urges the permit applicant to contact the acting such activity. Date Date 06/06/2008 AgenUOwner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into', Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request Is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.