Loading...
HomeMy WebLinkAbout0130410-Plumbing (toilet) OSHKOSH ON THE WATER Job Addn35s 122 W 17TH AVE PLUMBING Contractor SAMMONS PLUMBING Bathtub Shower _ Whirlpool Floor Drain Lavatory Lndry Tray _ Toilet 1 Disposal Res. Sink _ Dishwasher Bar Sink Sump Pump _ Water Heater - Classrm Sink Site Drain Breakrm Sink Roof Drain Ejector/Grind Misc. --- Fixtures Use/Nature FR /Replace toilet. '*DEB of Work Sanitary Sewer Water Softner _ Local Waste Clothes Wshr _ Bidet _ Beer Tap Lab Sink _ Sterilizer Dip Well Drink Ftn Storm Sewer Water Service Size OF OSHKOSH - APPLICATION AND RECORD ROBERT P MAGKEY 410 -Residential-Interior Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink. Serv Sink Type Shamp Sink _ Flr/VUst Sink Catch Basin _ Wash Ftn Urinal Standp Rec Ice Maker. Gar Drain ::Soda Disp n. Type No 130410 Create Date 06/05/2008 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Parcel Id # 0305810000 Valuation $300.00 Plan Approval $0.00 Permit Fees ~~~~'y~7 $25.00 ^ Permit Voided Issued By Date 06/06/2008 In the performance of this work, I agree to perform all work pursuantto rules governing the described construction. While the City of Oshkosh has no authority to enforce easement re frictions of which it is not a party, if you perform the work described in this permit application within an easement, the City stro~gly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgentlOwner Address 522 W. MURDOCK AVE OSHKOSH WI 54901_ - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.