HomeMy WebLinkAbout0130418-Plumbing (toilet)CITY OF OSHKOSH No 130418
OSHKOSH
ON THE WATER
Job Address 436 W 14TH AVE
Contractor SAMMONS PLUMBING
Bathtub. _
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink __
Water Heater
Site Drain _
Roof Drain
Misc.
Fixtures
Use/Nature upl
of Work
IT -APPLICATION AND RECORD
ELIZABETH OVERTON ;
410 -Residential-Interior
_ Shower Water Softner ~ Wait. St. Shamp Sink Coffee Maker
Floor Drain Local Waste ~ Ice Chest FIrIVUst Sink Int Grease Trap
_ Lndry Tray Clothes Wshr Exam Sink :Catch Basin Ext Grease Trap
1 Disposal Bidet Scuiry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
_ Sump Pump Lab Sink Plaster Sink ~ . Standp Rec _ Wtr Sewer Mtrs
_ Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Breakrm Sink Dip Well ~ F Prep Sink -Gar Drain Wtr Usage Mtrs
_
Ejector/Grind Drink Ftn Serv Sink Soda Disp
/ Replace toilet. "DEB IT ACCT**. I
Sanitary Sewer
Storm Sewer
Water Service
Type # Conn.
Create Date 06/05/2008
Plan
Parcel Id #
0907170000
Valuation
Issued By
PLUMBING
$300.00 Plan Approval $0.00 (Permit Fees $25.00 ^ Permit Voided
n
In the performance of this work, I agree to perform all work pursuant Ito rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement res 'ctions of which it is not a party, if you perform the work
described in this permit appiicaGon within an easement, the City stro~gly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before s rting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH
To schedule inspections please call the Inspection Regi
Inspection (i.e. Footing, Service, Final, etc.), Access intc
Number. Unless specified otherwise, we will assume th
continue if the inspection is not performed within two bi
Date 06/06/2008
WI 54901 - 2298 Telephone Number 231-9880
est line at 236-5128 noting the Address, Permit Number, Type of
Building if Secure (how do we gain entry), your Name and Phone
project is ready at the time the request is received. Work may
siness days from the time the project is ready.