Loading...
HomeMy WebLinkAbout0130256-Building (excavating)CITY OF OSHKOSH No 130256 OSHKOSH ON THE WATER Job Address 1220 N SAWYER ST Designer Owner HERGERT REALTY Contractor ANDERSON BROS INC Create Date 06/02/2008 Category 141 -Exterior Remodeling Type ~ Building ~ Sign (~ Canopy ~ Fence ~ Raze Plan Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier ~ Other Concrete Block ~ Post ~ Treated Wood -- Occupancy Permit Not Required _ Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication _ # Dwelling Units 0 # Structures 0 Use/Nature of Work BUILDING PERMIT -APPLICATION AND RECORD FR/ Excavating a section of the north foundation wall, east wall, and the corner of the south wall to install waterproofing for the oundation walls. HVAC Contractor Electric Contractor Fees: Valuation Issued By:~ ~~, Plumbing Contractor $2,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 06/02/2008 Final/O.P.00/00/0000 ^ Permit Voided ~ Parcel Id # 1604730000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applipnt to contact the easement holder(s) and to secure any_ ry approvals before starting such activity. I have read'and und~er'stand.~r~ ore ~tiwr~d~foro~rtion_ AgenUOwner Address 2 2 WHITE SWAN DR OSHKOSH WI 54901 - 0000 Date ~ ~ Telephone Number 9 0-233-4286 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the Inspection is not performed within two business days from the time the project is ready.