HomeMy WebLinkAbout0130158-Plumbing (sink & toilet)OSHKOSH
ON THE WATER
Job Address 820 E NEVADA AVE
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION AND RECORD
Owner ADVOCAP INC
Contractor AG MECHANICAL
Bathtub Shower
Whirlpool Floor Drain
Lavatory 1 Lndry Tray
Toilet 1 Disposal
Res. Sink Dishwasher
Bar Sink Sump Pump
Water Heater Classrm Sink
Site Drain Breakrm Sink
Roof Drain Ejector/Grind
Misc.
Fixtures
Use/Nature
of Work
Category 410 -Residential-Interior
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Shamp Sink
FIrlVllst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
No 130158
Create Date 05/27/2008
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
FR /REPLACE SINK AND TOILET **check #4855
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Valuation
Issued By
500.00 Plan Approval $0.00 Permit Fees $25.00 ^ Permit Voided
Parcel Id #
1511790000
Date 05/27/2008
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1820 MARATHON AVE NEENAH
WI 54956 - 4024 Telephone Number 920-751-0884
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not pertormed within two business days from the time the project is ready.