Loading...
HomeMy WebLinkAboutPW CNT 08-43/Change 1a & 1b-Joseph Hoban /seh To sbrand @ci.oshkosh.wi.us 01/22/2008 05:07 PM cc bcc Subject Change Order for Contract A an I forgot to mention that you need to sign all three copies of each of these document and return two to SEH and we will distribute to Town and County - and -an° . Thanks. Joseph T. Hoban, P.E. Professional Engineer Short Elliott Hendrickson Inc. 425 West Water Street Suite 300 Appleton, WI 54911 -6058 920 - 380 -2800 main 920- 380 -2814 direct 920- 380 -2801 fax 920- 470 -0957 cell off-' 6 5 ' 2on 888- 413 -4214 toll free B SEH CHANGE ORDER City of Oshkosh OWNER Contract 07 -02 January 14, 2008 DATE 1 OWNER'S PROJECT NO. WWTP Security Improvements — Contract A (Cameras and Doors) PROJECT DESCRIPTION The following changes shall be made to the contract documents: CHANGE ORDER NO. OSHKO0701.01 SEH FILE NO. Description: Change Order #la • Deduct 225 feet of 1 1 /2 -inch GRC conduit, and associated fittings and labor to install. Change Order #lb • Deduct 150 feet of GRC conduit and associated fittings and labor to install. • Add 150 feet of EMT conduit and associated fittings and labor to install. Purpose of Change Order: Change Order #la • Contractor will be utilizing an existing 2 -inch GRC conduit for a portion of the conduit run through the tunnel. [Total Deduct: - $1,315.00] Change Order #lb • In the office area contractor will install EMT conduit to match existing, in place of GRC. [Total Deduct: - $190.00] Change Order #1 Total Deduct - $1,505,00 Basis of Cost: ® Actual ❑ Estimated Attachments (list supporting documents) Change Order Proposals from Town & County Contract Status Original Contract Net Change Prior C.O.'s Change this C. 0. Revised Contract Recommended for Approval: Agreed to by�Contractor. BY Town & Country Dart Balm - Peo;ect Mana9elz TITLE to Time Cost $109,895.00 - $1,505.00 $108,390.00 Short Elliott Hendrickson I nc. by >kJ � atrick Planton! roject Manager Approved for Owner.- Q SEE NEXT BY City of Oshkosh TITLE Distribution Contractor 2 Owner 1 Project Representative 1 SEH Office 1 p: \ko \o \oshko \070100 \project\contracts a&b \construction \contract a \change orders \change order gl \change order 1 - contract a.doc 1/04 Short Elliott Hendrickson Inc., 425 West Water Street, Suite 300, Appleton, WI 54911 -6058 SEH is an equal opportunity employer I www.sehinc.com 1 920.380.2800 1 888.413.4214 1 920.380.2801 fax Signed for and in behalf of the City of Oshkosh on February 13, 2008 • - •. • • 1 nager Pamela R. Ubrig, City Clerk LyKn Marquardt, Assis t Director of Finance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. IA P CHANGE ORDER SEH Attn: Joe Hoban 425 W. Water St Appleton, WI 54911 -6058 Phone: 920 - 380 -2814 Fax: 920- 380 -2801 Joe, Faith Technologies, Inc. 2662 American Drive P.O. Box 627 Appleton, WI 54912 -0627 (920) 738 -1500 Date: 11 -29 -07 Prop. No.: DS07120001 Project: Deduct for GRC to EMT Location: Oshkosh Waste Water CC: Patrick Planton Town & Country Electric - Specialty Systems Division would like to thank you for the opportunity to provide you with a proposal for the above referenced project. This is in reference to the office area we are going to install EMT conduit to match existing in place of GRC conduit: Deduct 150' of GRC conduit, associated fittings and labor to install Add 150' of EMT conduit, associated fittings and labor to install Total Deduct: - $190.00 If you have any questions or concerns, please feel free to contact me at 920 - 225 -6527. Thank you, Dan Salm Project Manager ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment terms are net 25 days after date of invoice. Customer Acknowledges receipt of Faith Technologies (d/b /a Town & Country Electric) Standard Terms and Conditions. Signature: Date of Acceptance: Please fax signed contracts to: DAN SALM (920- 738 -8988) Proposal price is good for 30 days. U , MW __::C mitz CHANGE ORDER SEH Attn: Joe Hoban 425 W. Water St Appleton, WI 54911 -6058 Phone: 920 - 380 -2814 Fax: 920 - 380 -2801 Joe, Faith Technologies, Inc. 2662 American Drive P.O. Box 627 Appleton, WI 54912 -0627 (920) 738 -1500 Date: 12 -10 -07 Prop. No.: DS07120002 Project: Deduct to use existing conduit in tunnel Location: Oshkosh Waste Water CC: Patrick Planton Town & Country Electric- Specialty Systems Division would like to thank you for the opportunity to provide you with a proposal for the above referenced project. This is in reference to Town & Country Electric using an existing 2" GRC conduit for a portion of the conduit run through the tunnel. • Deduct 225' of 1 1 /2" GRC conduit, associated fittings and labor to install Total Deduct: - $1,315.00 If you have any questions or concerns, please feel free to contact me at 920 - 225 -6527. Thank you, Dan Salm Project Manager ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment terms are net 25 days after date of invoice. Customer Acknowledges receipt of Faith Technologies (d/b /a Town & Country Electric) Standard Terms and Conditions. Signature: Date of Acceptance: Please fax signed contracts to: DAN SALM (920- 738 -8988) Proposal price is good for 30 days.