Loading...
HomeMy WebLinkAboutEarth Tech # 84350 Amendment 4/29/2008EarthTech A tgCO International Ltd. Company September 28, 2007 Mr. David Patek Department of Public Works 215 Church Ave P.O. Box 1130 Oshkosh; WI 54903 -1130 � U9 U 15 � a APR 2 9 2008 CITY CLERK'S:: ;= 1210 Fourier Drive P 608.836.9800 Suite 100 F 608.836.9767 Madison, WI 53717 www.earthtech.com 3 2007 PUBU SH. w!: Subject: Amendment Request to Stormwater Management Planning Contract Earth Tech Project No. 84350 Dear Mr. Patek: This letter is requesting an amendment to the scope and budget for the above referenced project. The scope items detailed below have been reviewed by city staff and conducted under their direction. The scope changes were necessary to comply with WDNR guidance for compliance with NR 216 issued over the past year, and to update the analysis with data provided by the city. Below is a description of tasks and costs that have been, or are being conducted by Earth Tech in conjunction with to the above referenced project. These tasks are being conducted at the request of the city and are additional scope items to the original project contract: Description of Additional Project Tasks 1. Change in Street Cleaning Routes / Schedules / Equipment In September 2005 the city provided Earth Tech data on the city's street cleaning routes, schedule, and equipment. Earth Tech created WinSLAMM files to reflect these conditions and ran the WinSLAMM analysis to determine the TSS reduction from the initially provided street cleaning schedule and equipment. In August 2007 the city provided Earth Tech updated information on the street cleaning schedules and equipment and requested that the "existing management" WinSLAMM files be revised to reflect these new conditions. Earth Tech has made these revisions. 2. Additional Analyses for Catch Basins Storm sewer catch basin (with sumps) information was provided to Earth Tech from the city in September 2005. This data included the location and dimensions of all the existing catch basins with sumps in the city. In August 2007 the city requested Earth Tech to add data to account for existing catch basins with sumps that were installed in 2005, 2006, and 2007. The city provided data for these years and Earth Tech added the information to the existing analysis to account for the additional pollution control. This step required the recreation of new WinSLAMM land use files to reflect the additional areas treated with the additional catch basins with sumps. Earth Tech also re -ran the WinSLAMM analysis to account for the additional catch basins. EarthTech A fYICO International Ltd. Company Mr. David Patek Stormwater Plan Change Order Request September 28, 2007 Page 2 3. Analysis of Existing Structural BMPs (wet ponds) In September 2005 the city provided Earth Tech a spreadsheet describing each existing stormwater pond and the data necessary to analyze the pollution control effectiveness of each pond. This analysis was conducted by Earth Tech. In July and August of 2007 the city requested that the methods of existing pond analysis be revised to add a graphic showing the boundary of each pond's drainage area. Also four pond locations were added to the analysis. Earth Tech re= evaluated the ponds with the revised approach, and re -ran the WinSLAMM analysis to account for the additional existing pond data. 4. Re- Analysis of Base Area with WinSLAMM In September 2005 the city provided Earth Tech GIS data sufficient to determine the areas of the city that would be subject to the NR 151.12 regulations for new development and those developing areas that are not subject to NR 151.12. These two classifications define geographic areas of the city that must be included or excluded from the base level WinSLAMM. In September 2007 additional areas of the city were discovered that were not subject to NR 151.12 and should have been included in the base level WinSLAMM analysis conducted in 2005. This change will likely benefit the city in meeting its 20% and 40% TSS control requirements. Earth Tech will incorporate the additional developing areas of the city not subject to NR 151.12 into the WinSLAMM modeling and revise the current TSS loading tables to reflect these changes. Change Order Request Costs Task Cost Hrs 1. Change in Street Sweeping Routes / Schedules / Equipment $ 2,900 34 2. Additional Analyses for Catch Basins $ 2,500 30 3. Analysis of Existing Structural BMPs (wet ponds) $ 2,750 31 4. Re- Analysis of Base Area with WinSLAMM $ 1,750 22 $ 9,900 117 Thank you for you consideration of this request and please do not hesitate to contact me with any questions at 608- 828 -8121. Sincerely, c Earth Tech, Inc. J mes A. Bachhuber ater Resources Department Manager cc: James Rabe; City of Oshkosh Signed for and in behalf of the City of Oshkosh Richard A. Wollangk, City Manager Edward A. Nokes, City Comptroller I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. 2A