Loading...
HomeMy WebLinkAboutN Branch Campbell Ck Amend # 5SaL STRAND ASSO CIATES, INC. - E N G I N E E R S 910 West Wingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet, IL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH www.strand.com February 6, 2008 City of Oshkosh 215 Church Avenue Oshkosh, WI 54903 -1130 Attention: David Patek, P.E., Director of Public Works Re: Agreement for Planning Services — Amendment No. 5 North Branch Campbell Creek Stormwater Management Plan This is Amendment No. 5 to the referenced Agreement for Planning Services dated May 26, 2005. Under Scope of Services, Item D. Analysis of potential impacts of future development on the existing drainage system, ADD the following: "23. Alternative 13b —Using the updated model, analysis of the effect of removing the 9th Street/Washburn Street detention basin from Alternative 12 and including new detention basins(s) located in the Westhaven Golf Course with a 75 -foot buffer between the back property lines of the adjacent residential property and the edge of the proposed walking path. A conceptual park layout will not be included with this alternative. The Armory detention basin footprint will be reduced so that it does not include the 5 acres of commercial property on the west end. This Westhaven detention basin preliminary design will maximize the obtainable storage volume based on the area draining to the pond to match the effect of Alternative No. 16 analyzed in the December 2007 Draft Report." Under Scope of Services, Item D. Analysis of potential impacts of future development on the existing drainage system, DELETE Item 21, and REPLACE with: "21. Pipe capacity analysis of the entire modeled system to show the pipe capacity according to design storm in a GIS figure with the recommended alternative in place. A second pipe capacity analysis of the entire modeled system to show the pipe capacity according to design storm in a GIS figure with a second alternative in place." L FEI J 3 1 CITY CtERK;� ° Attention: David Patek, P.E., Director of Public Works Re: Agreement for Planning Services — Amendment No. 5 North Branch Campbell Creek Stormwater Management Plan This is Amendment No. 5 to the referenced Agreement for Planning Services dated May 26, 2005. Under Scope of Services, Item D. Analysis of potential impacts of future development on the existing drainage system, ADD the following: "23. Alternative 13b —Using the updated model, analysis of the effect of removing the 9th Street/Washburn Street detention basin from Alternative 12 and including new detention basins(s) located in the Westhaven Golf Course with a 75 -foot buffer between the back property lines of the adjacent residential property and the edge of the proposed walking path. A conceptual park layout will not be included with this alternative. The Armory detention basin footprint will be reduced so that it does not include the 5 acres of commercial property on the west end. This Westhaven detention basin preliminary design will maximize the obtainable storage volume based on the area draining to the pond to match the effect of Alternative No. 16 analyzed in the December 2007 Draft Report." Under Scope of Services, Item D. Analysis of potential impacts of future development on the existing drainage system, DELETE Item 21, and REPLACE with: "21. Pipe capacity analysis of the entire modeled system to show the pipe capacity according to design storm in a GIS figure with the recommended alternative in place. A second pipe capacity analysis of the entire modeled system to show the pipe capacity according to design storm in a GIS figure with a second alternative in place." 5d City of Oshkosh Page 2 STRAND February 6, 2008 ASSO CIATES, INC. - E N G I N E E R S Under Scope of Services, ADD the following: "G. Renderings 1. Provide two renderings consisting of the following: a. Rendering No. 1 —Aerial perspective of Westhaven Park showing Alternative 13b Layout (City to choose from two alternative perspectives e- mailed from Strand to City prior to performing the rendering). b. Rendering No. 2 —Cross section showing edge of home of one side of park, buffer, walking path, and one -third of pond/wetland. City to choose cross section location prior to Strand performing this. 2. Send two renderings to the City for review in draft format. 3. Participate in one telephone conversation with City staff to discuss City's review of draft renderings. 4. Make minor revisions to draft renderings based on City review. 5. Send two final renderings to the City in paper and electronic formats. Paper renderings will be provided as board - mountable exhibits, one per rendering." Under Obligations of Owner, ADD: "9. Provide pictures of the Westhaven Golf Course without snow cover." Under Compensation, CHANGE the lump sum fee from $130,300 to "$146,100." REPLACE table with the following: Total Cost "Topographical Survey $ 13,500 Admin and Meetings 12,200 Stormwater Modeling/Analysis 78,400 Stormwater Management Plan 36,400 Renderings 5,600 Total Cost $146,100" JHL:nuo\R:\Documents\Agreements \Oshkosh, City of (WI) \CampbellCreekStrmwtrPin .2005- Ongoing\Amd \1- 382- 030.5.doc City of Oshkosh Page 3 STRAND. February 6, 2008 ASSO CIATES, INC® E N G I N E E R S DELETE Schedule and REPLACE with: "Schedule The final Plan Amendment will be completed by February 26, 2008, assuming Amendment No. 5 is signed by February 8, 2008." IN WITNESS WHEREOF the parties hereto have made and executed this Amendment. ENGINEER: OWNER: STRAND ASSOCIATES, INC. CITY OF OSHKOSH Matthew S. Richards Da e J itzpatrick Date Corporate Secretary Acting City Ma Date &rw4 Finance Director JHL:mro\R:\Documents\Agreements \Oshkosh, City of (WI) \CarnpbellCreekStrmwtrP1n .2005- Ongoing\Amd \1- 382- 030.5.doc