Loading...
HomeMy WebLinkAboutPW CNT 07-06/Change Order #1City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 OIHKO H 9p[ ON THE WATER JAN _I January 10, 2008 CITY `Y Mr. Leroy Fischer Fischer -Ulman Construction, Inca 1115 S. Theodore Street Appleton, WI 54915 Re: Change Order #1 /Contract 07 -06 Dear Mr. Fischer: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Fischer -Ulman Construction, Inc. regarding the above- mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, Assistant City Attorney (w /copy) File Copy (w /original) CHANGE ORDER # 1 DATED: December 7, 2007 TO: Fischer -Ulman Construction, Inc. 1115 S. Theodore St. Appleton, WI 54915 Your present contract with the City of Oshkosh, Contract No. 07 -06 , is hereby amended and changed as follows: NET INCREASE - CONCRETE SIDEWALK (New and Reconstruction) $65,529.88 NET INCREASE TO CONTRACT: $65,529.88 C BY: Recommended: irector of Public orks and accept : ontr ctor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller - _-* CONTRACT: 07 -06 CHANGE ORDER # 1 CONCRETE SIDEWALK (New and Reconstruction) 1. Approx. 88,000 square feet INCREASE IN DECREASE /N ITEM of sidewalk removal & CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1. Approx. 88,000 square feet of sidewalk removal & driveway removal, complete as specified, per square foot 88,000 103,886.64 15,886.64 $0.39 $6,195.79 2. Approx. 5,500 linear feet of concrete /asphalt sawing, complete as specified, per linear foot 5,500 4,906.10 - 593.90 $2.25 $1,336.28) 3. Construct approx. 75,000 square feet of 4" thick concrete sidewalk in various locations in the City of Oshkosh, complete as specified, per square foot 75,000 97,218.59 22,218.59 $2.67 $59,323.64 4. Construct approx. 17,500 square feet of 6" thick concrete sidewalk in various locations in the City of Oshkosh, complete as specified, per square foot 17,500 17,283.16 - 216.84 $3.05 ($661.36) 5. Construct approx. 1,800 square feet of 7" thick crosswalk areas, complete as specified, per square foot 1,800 3,933.60 2,133.60 $3.25 $6,934.20 6. Provide and install approx. 160 square feet of metal detectable warning plates, complete as specified, per square foot 160 260.00 100.00 $32.00 $3,200.00 7. Approx. 2,000 square feet of three (3 ") inch asphalt replacement, complete as specified, per square foot 2,000 2,736.30 736.30 $3.20 $2,356.16 8. Approx. 400 linear feet of curb and gutter removal, complete as specified, per linear foot 400 557.70 157.70 $3.80 $599.26 9. Approx. 400 linear feet of 30" curb and gutter, complete as specified, per linear foot 400 587.80 187.80 $16.80 $3,155.04 Page 1 CONTRACT: 07 -06 CHANGE ORDER # 1 ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 10. Approx. 1,200 square yards of terrace restoration, including seed, fertilize, and mulch, complete as specified, per square yard 1,200 335.80 - 864.20 $3.50 ($3,024.70) 11. Furnish and install approx. 200 pavement ties, complete as specified, each 200 110.00 -90.00 $7.00 ($630.00) 12. Construct approx. 3,000 square feet of 4" thick concrete sidewalk in Water Dept. repair locations at approx. 60 sites, complete as specified, per square foot 3,000 3,955.21 1 955.21 $3.95 $3,773.08 13. Construct approx. 750 square feet of 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified, per square foot 750 989.06 239.06 $4.10 $980.15 14. Approx. 100 square yards of 7" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 100 208.77 108.77 $38.00 $4,133.26 15. Approx. 1,800 square yards of 8" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 1,800 688.06 - 1,111.94 $38.50 ($42,809.69) Page 2 CONTRACT: 07 -06 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 16. Approx. 100 square yards � PRICE 1. of 8" special High Early Strength, non - reinforced concrete 0 31 31.00 $10.00 $310.00 2. pavement removal and replacement, including sawing, pavement ties, integral curb and grading, terracing and traffic control, 0 1.00 1.00 $570.001 $570.00 3. complete as specified, per -88.69 $45.00 ($3,991.05) square and 100 11.31 77.60 $2.25 $174.60 17, Approx. 200 tons extra crushed stone base, complete as specified, per 51.00 - 149.00 $14.00 ($2,086.00) ton 200 18. Approx. 600 linear feet of No. 4 epoxy- coated reinforcement rods, installed as specified, per linear foot 600 840.00 240.00 $1.50 $360.00 19. Furnish, install and maintain Type "C' Inlet protection in approx. 5 locations, complete as 1.00 $85.00 $85.00 specified, each 5 6.00 20. Approx. 150 linear feet of 12" wide radius curb head, complete as specified, per -33.40 $3.00 ($100.20) linear foot 150 116.60 21. Provide $1,500 to the City of Oshkosh for project management communications, complete as specified, lump sum 1 1.00 $1,500.00 BID ITEMS 1 -21 - SUB -TOTAL . $91,095.58 ($54,639.28) ADDITIONAL WORK REQUIRED: C.O. # 1 Page 3 INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT QUANTITIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COST PER UNIT CONTRACT CONTRACT PRICE NUMBER � PRICE 1. Replace 6" curb head at 222 Jackson Street, per lineal foot 0 31 31.00 $10.00 $310.00 2. Clean out rubble from basement and form base for sidewalk installation at 101 Algoma Blvd. as specified, lump sum 0 1.00 1.00 $570.001 $570.00 3. Erosion control mat, per square yard 0 77.60 77.60 $2.25 $174.60 Page 3 CONTRACT: 07 -06 CHANGE ORDER # 1 ADDITIONAL WORK: C.O. # 1 - (ITEMS 1 - 7) - SUB -TOTAL $29,073.58 NET INCREASE - $65,529.88 NET INCREASE TO CONTRACT: $65,529.88 $0.00 Page 4 INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT QUANTITIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COST PER UNIT CONTRACT CONTRACT PRICE NUMBER PRICE 4. Replace 4" asphalt, per square foot 0 977.85 977.85 $4.27 $4,175.42 5. Construct 8" sidewalk, complete as specified, per square foot 0 885.00 885.00 $4.72 $4,177.20 6. 7 -13ag mix concrete /8 ", per square yard 0 432.55 432.55 $42.50 $18,383.38 7. 7 -13ag mix concrete /9 ", per square yard 1 0 27.01 27.01 $47.50 $1,282.98 ADDITIONAL WORK: C.O. # 1 - (ITEMS 1 - 7) - SUB -TOTAL $29,073.58 NET INCREASE - $65,529.88 NET INCREASE TO CONTRACT: $65,529.88 $0.00 Page 4