Loading...
HomeMy WebLinkAbout0103007-Building (parking lot)OSHKOSH ON THE WATER Job Address 130 CHURCH AVE Designer Category Type Zoning 256 - Parking Lots, Driveways · Building O Sign Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation (~ Poured Concrete (~ Floating Slab (~ Concrete Block (~) Post Occupancy Permit Not Required Park Dedication CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner FISS & BILLS INC Contractor BADGER HIGHWAYS Create Date Plan (~)Canopy (~ Fence (~) Raze Class of Const: Size No 103007 07/22/2003 Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 ~ Pier · Other (~) Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures [] Projection Canopies Signs 0 Use/Nature IFuneral Home / Pave east gravel parking lot, install various lengths of fencing per submitted plan. of Work HVAC Contractor Plumbing Contractor Electric Contractor IssuedFees: Valua~14,226.00By: Plan Approval $0.00 Permit Fee Paid [] Permit Voided $80.00 Park Dedication $0.00 Date 07/22/2003 FinallO. P. 00/00/0000 In the performance of this work I agre~to~work pursuant to rules governing the described construction. Signature ,.,~ ~,~ ~'~ ~- j Date ! V Agent/Owner Address I~/HHURCH AVE / OSHKOSH WI 54901 - 4746 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST ZONING: C'~-~ JO. LOCAT,O.: t3o PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: New Construction __ Addition %(~ Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parkinglot, sign, etc.) -~Z~ ~.~ pEFICIENT Use Lot Width Lot Area Lot Area Per Family Flood Plain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Mechanical Equip. Screening COMMENTS REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. /'~ APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: DISCLAIMER Poklasny, Inc. City of Oshkosh Wisconsin Community Development 1": 40' O.J'HKO. FH Created by - MT N A 07/22/2003