HomeMy WebLinkAbout0103007-Building (parking lot)OSHKOSH
ON THE WATER
Job Address 130 CHURCH AVE
Designer
Category
Type
Zoning
256 - Parking Lots, Driveways
· Building O Sign
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation (~ Poured Concrete (~ Floating Slab
(~ Concrete Block (~) Post
Occupancy Permit Not Required
Park Dedication
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner FISS & BILLS INC
Contractor BADGER HIGHWAYS
Create Date
Plan
(~)Canopy (~ Fence (~) Raze
Class of Const:
Size
No 103007
07/22/2003
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
~ Pier · Other
(~) Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
[] Projection
Canopies
Signs
0
Use/Nature IFuneral Home / Pave east gravel parking lot, install various lengths of fencing per submitted plan.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
IssuedFees: Valua~14,226.00By:
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided
$80.00 Park Dedication $0.00
Date 07/22/2003 FinallO. P. 00/00/0000
In the performance of this work I agre~to~work pursuant to rules governing the described construction.
Signature ,.,~ ~,~ ~'~ ~- j Date
! V Agent/Owner
Address I~/HHURCH AVE / OSHKOSH WI 54901 - 4746 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
ZONING: C'~-~
JO. LOCAT,O.: t3o
PROPERTY OWNER/CONTRACTOR:
CONSTRUCTION DATA: New Construction __ Addition %(~ Alteration
TYPE OF CONSTRUCTION: (i.e. fence, pool, parkinglot, sign, etc.) -~Z~ ~.~
pEFICIENT
Use
Lot Width
Lot Area
Lot Area Per Family
Flood Plain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Mechanical Equip. Screening
COMMENTS
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming
and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is
conforming and when no change is proposed.
/'~ APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY:
DISCLAIMER
Poklasny, Inc.
City of Oshkosh Wisconsin
Community Development
1": 40'
O.J'HKO. FH
Created by - MT
N
A
07/22/2003