HomeMy WebLinkAbout0103228 BOSHKOSH
ON THE WATER
,Job Address 516 W 18TH AVE
Designer
Category 251 - Fences
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAEL/LOiS NOONE
Contractor OWNER
· Fence (~ Raze
Type O Building (~ Sign (~) Canopy
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0
Finished/Living 0 Sq. Ft. Bedrooms 0
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete (~ Floating Slab (~ Pier
O Concrete Block (~ Post O Treated Wood
Occupancy Permit Flood Plain __
Park Dedication # Dwelling Units
Create Date
Plan
Height 0 Ft.
Stories
No 103228
07/31/2003
Size
[] Projection
Canopies 0
Signs 0
(~)Other
Height Permit
0 # Structures 0
Use/Nature ~FR/ Constructing a 4' high chain link fence 32 linealfeet along the side Iotline (continuing ffomfenceissued under permit 102259).
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $250.00 Plan Approval
$0.00 Permit Fee Paid
Issued By: (~"~--~' Date 07/31/2003
$20.00 Park Dedication $0.00
Final/O.P. 00/00/0000
[] Permit Voided J
n the performance of th §'wor~ 1 8g~:ee.'(~ ~rfCC~n a work pursuant to rules governing the described ~ns~uction.
/ ~ ( Agen~O~er
Date
Address 1922 ARIZONA ST OSHKOSH WI 54902 ~ 7009 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
JOB LOCATION:
ZONING/LAND USE COMPLIANCE CHECKUST
ZONING
PROPERTY OWNER/CONTRACTOR:
CONSTRUCTION DATA: New Construction Addition
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) ,~' ~/~-.~
Alteration
COMPLIANCE CHECKLIST
DEFICIENT
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Ama
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
COMMENTS
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc.,
when the use is conforming and when no change is proposed.
APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: --~
DATE:
N~W ~ARA~ &---/
CONC, ?LATWORK
APRON
0
NEW RAISED
STEEL BALCONY
NEW CONCRETE
STOOP
NEW ASPHALT
DRIVEWAY
EXISTING 4II SANITARY~
6II STORM & '~" WATER
SERVICE
NEW COICR~TE
/ PATIOS ~ WALK
CONC. TO BE
REMOVED
89°54-150"
{SIDEWALK)
81.67~