HomeMy WebLinkAbout0128399-Building
OSHKOSH
ON THE WATER
Job Address 82 E WAUKAU AVE
Designer
Category 110 -New Single Family Plan 002-0108
Type ~ Building ~ Sign ~ Canopy ~ Fence ~ Raze
Zoning R-1 Class of Const: 8 _ Size IRR
Unfinished/Basement 1628 Sq. Ft.
FinishedlLiving 3724 Sq. Ft.
Garage 1100 Sq. Ft.
Foundation ~ Poured Concrete ~ Floating Slab
Concrete Block ~ Post
Rooms 6 Height
Bedrooms 2 Stories 1
Baths 3 _
Pier (~ Other
Treated Wood
Occupancy Permit Required Occupancy Fee $0.00 Flood Plair No
Park Dedication Not Required # Dwelling Units 1
Use/Nature NSFR/ 1 story home with a three car attached garage.
of Work
CITY OF OSHKOSH No 128399
BUILDING PERMIT -APPLICATION AND RECORD
Owner GREGORY S/JOANN POLLESCH Create Date 01/04!2008
Contractor HENNESS~Y HOMES INC _
24 Ft. ^ Projection
Canopies
Signs
Height Permit Not Required
# Structures 1
HVAC Contractor BERKEN HEATING & COOLING INC
Electric Contractor DIERSEN ELECTRIC LLC
Fees: Valuation $407,774.00 Plan Approval
Issued By:
Plumbing Contractor WATTERS PLUMBING
$75.00 Permit Fee paid $1,432.00 Park Dedication $0.00
Date 01/08/2008 Final/O.P.00/00/0000
^ Permit Voided I Parcel Id # 1416210000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which,it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to any necessary approvals before starting such activity.
I have read an unders nd the a Ere mentioned information.
Date , CJ
Signature .. ~ ,~
Address 791 TERRA COTTA DR
Agent/Owner
NEENAH WI 54956 - 0000 Telephone Number 832-9691
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.