HomeMy WebLinkAbout0104057-Building CITY OF OSHKOSH
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
JobAddress 749 CENTRAL ST Owner JULIA M TAYLOR Create Date
Designer Contractor OWNER
Category 140 - interior Remodeling Plan
Type · Building (~ Sign O Canopy O Fence ~ Raze
Zoning Class of Const: Size
No 104057
09/09/2003
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection
Fthished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies __
Garage 0 Sq. Ft. Baths 0 Signs
Foundation · Poured Concrete (~ Floating Slab (~ Pier (~ Other
(~) Concmts Block (~ Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain __ Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
0
0
Use/Nature
of Work
~FR/Remodeling the existing bathroom (no walls will be moved). Installing new insullation, drywall, and an exhaust fan. The toilet and
sink will be replaced, This permit does not include the required electrical or plumbing permits.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
HOMEOWNER
$1,000.00 PlanApproval
Plumbing Contractor
$0.00 Permit Fee Paid
[] Permit Voidedj
HOMEOWNER
$20.00 Park Dedication $0.00
Date 09/09/2003 FinallO.P. 00/00/0000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary~provals befo...~ sta[ting such activity, t~
[ ~. /C,~/ Agent/Owner
Address 749 CENTRAL ST'") OSHKOSH WI 54901 - 0000 Telephone Number
(
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.