Loading...
HomeMy WebLinkAbout0104057-Building CITY OF OSHKOSH OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER JobAddress 749 CENTRAL ST Owner JULIA M TAYLOR Create Date Designer Contractor OWNER Category 140 - interior Remodeling Plan Type · Building (~ Sign O Canopy O Fence ~ Raze Zoning Class of Const: Size No 104057 09/09/2003 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection Fthished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies __ Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete (~ Floating Slab (~ Pier (~ Other (~) Concmts Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain __ Height Permit Park Dedication # Dwelling Units 0 # Structures 0 0 0 Use/Nature of Work ~FR/Remodeling the existing bathroom (no walls will be moved). Installing new insullation, drywall, and an exhaust fan. The toilet and sink will be replaced, This permit does not include the required electrical or plumbing permits. HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~ HOMEOWNER $1,000.00 PlanApproval Plumbing Contractor $0.00 Permit Fee Paid [] Permit Voidedj HOMEOWNER $20.00 Park Dedication $0.00 Date 09/09/2003 FinallO.P. 00/00/0000 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary~provals befo...~ sta[ting such activity, t~ [ ~. /C,~/ Agent/Owner Address 749 CENTRAL ST'") OSHKOSH WI 54901 - 0000 Telephone Number ( To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.