Loading...
HomeMy WebLinkAbout08-03JANUARY 8, 2008 08-03 RESOLUTION (CARRIED ~ ~ LOST LAID OVER WITHDRAWN ) PURPOSE: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT NO, 07-06 ($65,529.88) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: Fischer-Ulman Construction, Inc. 1115 S. Theodore St. Appleton, WI 54915 Net Increase to contract: $65,529.88 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 311-0410-7480-00000 Sidewalk Construction Fund Expenditures Acct. No. 317-0410-7480-03304 Special Assessments - Sidewalks Acct. No. 541-1867-6401-08673 Water Utility - Maintenance of Mains Acct. No. 541-1867-6401-08675 Water Utility - Maintenance of Services CHANGE ORDER # 1 DATED: December 7, 2007 TO: Fischer-Ulman Construction, Inc. 1115 S. Theodore St.. Appleton, WI 54915 Your present contract with the City of Oshkosh, Contract No. 07-06 , is hereby amended and changed as follows: NET INCREASE - CONCRETE SIDEWALK (New and Reconstruction) $65,529.88 ~ NET INCREASE TO CONTRACT: $65,529.88 CITY OF OSHKOSH BY: Recommended: Director of Public Works - Cifiy Manager City Clerk Approved and accep~~ n ~ ontr~ctor ~~ ~ I certify that provision has been made to pay the fiability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 07-06 CHANGE ORDER # 1 CONCRETE SIDEWALK (New and Reconstruction) lNCREASE IN DECRF.ASElN 1TEM DESCRlPTlON CONTRACT QUANTlT/ES INSTALLED QUANTITIES NET /NCREASE NET DECREASE COSTPER UNlT CONTRACT PRICE CONTRACT PRICE NUMBER 1. Approx. 88,000 square feet of sidewalk removal & driveway removal, complete as specified, per 000 88 886.64 103 15,886.64 0.39 ~ $6,195.79 s uare foot , , 2. Approx. 5,500 linear feet of concrete/asphalt sawing, complete as specified, per 500 5 906.10 4 -593.90 $2•25 1,336.28 ~ l inear foot , , 3. Construct approx. 75,000 square feet of 4" thick concrete sidewalk in various locations in the City o,f Oshkosh, complete as specified, per square foot 75,000 97,218.59 22,218.59 2,67 ~ $59,323.64 4. ~ Construct approx. 17,500 square feet of 6" thick concrete sidewalk in various locations in the City of Oshkosh, complete as . ' specified, per square foot 17,500 17,283.16 -216.84 $3.05 ($661.36 5. Construct approx. 1,800 square feet of 7" thick crosswalk areas, complete as specified, per square 800 1 933.60 3 2,133.60 $3.25 $6,934.20 foot , , 6. Provide and install approx. 160 square feet of inetai detectable warning plates, complete as specified, per 160 00 260 100.00 $32.00 $3,200.00 s uare foot . 7. Approx. 2,000 square feet of three {3"} inch asphalt replacement, complete as s ecified, er s uare foot 2,000 2,736.30 736.30 $3.20 $2,356.16 8. Approx. 400 linear feet of curb and gutter removal, complete as specified, per 400 70 557 157.70 $3.80 $599.26 linear foot . 9. Approx. 4~0 linear feet of 30" curb and gutter, complete as specified, per 40 0 587.80 187.80 $16.8 0 $3,155.04 linear foot page 1 CONTRACT: 07-06 CFiANGE ORDER # 1 INCREASE !N DECREASE !N lTEM CONTRACT lNSTALLED NET NET COSTPER CONTRACT COMTRACT NUMBE'R DESCRlPTlON QUANTlTIES QUANTlTlES lNCREASE DECREASE UNlT PRlCE PRlCE 10. Approx. 1,200 square yards of terrace restoration, including seed, fertilize, and mulch, complete as specified, per square yard 1,200 335.80 ~ -864.20 $3.50 $:3,024.70 11. Furnish and instali approx. 200 pavement ties, complete as specified, 200 110 00 00 -90 $7.00 $630.00) each . . 12. Construct approx. 3,000 square feet of 4" thick concrete sidewalk in Water Dept. repair Iocations at approx. 60 sites, complete as specified, per square foot 3,000 3,955.21 955.21 $3.95 $3;773.08 13. Construct approx. 750 square feet of 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified, per square foot 750 989.06 239.06 $4.10 $980.15 14. Approx. 100 square yards of 7" non-reinforced concrete pavement removai and replacement, including sawing, ~ pavement ties; integral curb & grading,terracing & traffic control, complete as specified, per square yard 100 208.77 108.77 $38.00 $4,133.26 15. Approx. 1,800 square yards of 8" non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 1,800 688.06 -1,111.94 $38.50 ($42,809.69 Page 2 CONTRACT: 07-06 CHANGE ORDER # 1 (NCREASEIN DECREASEIN lTEM CONTRACT INSTALLED NET NET COSTPER CONTRACT CONTR,4CT NUMBER DESCR/PTlON QUANTITIES QUANTITIES INCREASE DECREASE UN1T pRICE Pf~ICE 16. Approx. 100 square yards of 8" special High Early Strength, non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading, terracing and trafFic control, complete as specified, per 100 31 11 -88.69 $45.00 $3,991.05) s uare ard . 17. Approx. 200 tons extra crushed sfone base, complete as specified, per ton 200 51.00 -149.00 $14.00 $2,086.00 18. Approx. 600 linear feet of No. 4 epoxy-coated reinforcement rods, installed as specified, per linear foot 600 840.00 240.00 $1.50 $360.00 19. Furnish, install and maintain Type "C" Inlet protection in approx. 5 locations, complete as 5 00 6 1.00 $85.00 $85.~0 s ecified, each . 20. Approx. 1501inear feet of ' 12" wide radius curb head, compiete as specified, per ar foot li 150 116.60 -33.40 $3.00 $100.20) ne 21. Provide $1,500 to the City of Oshkosh for project management communications, complete as specified, lump sum $1 00 500 1 1.00 , . BiD ITEMS 1-21 - SUB-T OTAL . $91,095.58 ($54,639.28) ADDITIONAL WORK REQUIRED: C.O. # 1 JNCREASE fN DECREASE IN ITEM CONTRACT WSTALLED NET NET COST PER CONTR,4CT C~NTRACT NUMBER DESCRIPTION QUANTITIES QUANTITlES lNCREASE DECREASE UNIT pRICE i°R1CE 1. Replace 6" curb head at 222 Jackson Street, per 00 1 00 $10 $310.00 lineal foot 0 31 3 . . 2. Clean out rubble from basement and form base for sidewalk install.ation at 101 Algoma Blvd. as 1 00 00 1 $570.00 $570.00 s ecified, lum sum 0 . . 3. Erosion control mat, per 77 60 60 77 2,25 ~ $174.60 s uare ard 0 . . Page 3 CONTRACT: 07-06 CHANGE ORDER # 1 INCREASE 1N DECFtEASE !N ITEM DESCRIPTION CONTRACT QUANTITIES INSTALLED QUANTITlES NET /NCREASE NET DECREASE COST PER UNIT CONTRACT pR1CE CONTRACT PR1CE NUMBER 4. Replace 4" asphalt, per s uare foot 0 977.85 977.85 $4.27 $4,175.42 5. Construct 8" sidewalk, complete as specified, per s uare foot 0 885.00 885.00 $4.72 $4,177.20 6. 7-Bag mix concretel8", per s uare ard 0 432.55 432.55 $42.50 $18,383.38 7. 7-Bag mix concrete/9", per s uare ard 0 27.01 27.01 $47.50 $1,282.98 ADDITIONAL WORK: C.O, # 1-(ITEMS 1- 7) - SUB-TOTAL NETiNCREASE- $29,073.58 $65,529.88 $0.00 NET INCREASE TO CONTRACT: • $65,529.88 Page 4