HomeMy WebLinkAbout08-11JAN UARY 08, 2008
08-11 RESOLUTION
(CARRIED~ ~U LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE AMENDED AGREEMENT WITH AT&T / ANCHORAGE
BASIN PROJECT ($30,525.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, by Resolution 05-292 adopted September 27, 2005, the Common
Council approved a contract with AT&T for relocation of fiber optic cable required for the
Anchorage Basin Storm Water Improvements project; and
WHEREAS, by Resolution 06-226 adopted July 11, 2006, the Common Council
approved an amendment to the agreement for other construction methods adjacent to the
Canadian National Railroad to preserve and protect its right-of-way bringing the total to
$119,102.00; and
WHEREAS, it is necessary to amend this agreement for the additional costs for rock
excavation in the amount of $30,525.00, bringing the total to $149,627.00.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that this amendment is hereby approved and the proper City officials are hereby
authorized and directed to take those steps necessary to implement the terms and
conditions of the Agreement as amended.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 561-2010-1799-0000 - Storm Water Utility - Construction in Progress.
~~
~.
June 29, 2006
Scope of Work
Appleton - Watertown Jct FT "A" Cable
City of Oshkosh Culvert Installation under CN Railroad
The Location:
This project is located along the CN Railroad in the city of Oshkosh, WI
The Work:
This work involves the installation of a new route approximately 3300 feet of length from an
existing splice location at Murdock road to a proposed splice location. Installation of new fiber
cable and completing a sheath opening splice. Contractor will be.;esponsible to assist the AT&T
splicers during the cut over and installation and removal of a splice shack with needed shoring.
THE WORK WILL CONSIST OF THE FOLLOWING:
1. Directional boring and installing 350 feet of 4" SDR 11 HDPE duct with two 1.25" ducts
under the tracks, one road crossing and proposed culvert installation area.
2. Directional bore and plow two 1.25" ducts the remainder of the route from the splice point to
the proposed splice location.
3. Installation of 3700 feet of new fiber cable.
4. At the proposed splice location expose 50 feet of cable, remove the duct from the cable and
construct a splice shack for the cut over.
5. After the cut over remove the splice shack and coil the new splice up and install a handhole of
the new splice. '
6. Install AT&T cable warning tape, backfill and mechanically compact all excavated areas.
7. Clean up all disturbed areas along the route as good as or better condition.
NOTE: Extreme caution will be used when working around the
existing AT&T fiber cable and no work will be done in the
existing AT&T right-of-way with out a AT&T technician on
site. ~
NOTE: All work will be completed as per the AT&T Specifications
for Outside Plant Construction and Maintenance.
:', , .
2
June 29, 2006
Cost Estimate
Appleton - Watertown Jct FT "A" Cable
City of Oshkosh Culvert Installation under CN Railroad
Engineering - Consultant:
1. Investigation, Engineering,
2. Construction Inspection
3. Travel and lodging
Construction Cost: (Inciuding Materiais)
l. Mobilization
2. Directional Bore 4" SDR 11 HDPE
3. Directional Bore two 1.25" SDR 11 HDPE
4. Plow two 1.25" SDR 11 HDPE
5. Install and Remove Shoring
6. Expose Fiber Cable
7. Install Fiber Cable
8. Install Handholes
9. Expose Splice Handhole
10. Remove duct from Fiber Cable
11. Construct Splice Shack
12. Relocate Marker Poles
AT&T Cost:
1. AT&T Technician
2. AT&T Engineer
3. AT&T Splice Crews for 2 PCI
4. 3700 Feet of 24 fiber Cable
TOTAL $ 18,777.00
TOTAL $ 53,025.00
TOTAL $ 32,300.00
~ i °' a
CN Railroad Cost:
1. CN Railroad Flagman
TOTAL COST ESTIMATE:
1. Consultant
2. Construction
3. AT&T Cost
4. CN Railroad Cost
TOTAL $15,000.00
GRAND TOTAL $119,102.OQ
~
;
3
- WI Oshkosh Culvert Relocation Project
96486
~ ~ ~
i
; ~
,
Totals for WI Oshkosh Culvert Relocation Project
~
Michels Corporation - Contractor $ 116,399.05
Buco Services Ltd.- Engineering $ 38,413.64
TTL Suppiy - Cable $ 7,540.00 ~
Wisconsin Central Limited - Flagging $ 22,062.50
at&t Personnel $ 4,947.63
Total Project Cost $ 189,362.82
Breakdown for project
City of Oshkosh- agreed reimbursable amount $ 119,102.00
Michels charge for rock bore ,$ 30,525.00
AT&T portion for cost to go splice to splice $ 39,735.82
Total for Project ~ $ 189,362.82
City of Oshkosh proposed cost to be billed $ 149,627.00
~
b at&t for this project ~