Loading...
HomeMy WebLinkAbout0128314-BuildingCITY OF OSHKOSH No 728374 OSHKOSH ON THE WATER Job Address 82 E WAUKAU AVE Designer Category 161 -Wrecking Residential Dwelli Owner GREGORY S/JOANN POLLESCH Create Date 01/02/2008 Contractor MARCKS TRUCKING & EXCAVATING Plan Type ~ Building ~ Sign ~ Canopy ~ Fence ~ Raze ~ Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ~ Projection Finished/Living Sq. Ft. Bedrooms Stories .Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier ~ Other Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work BUILDING PERMIT - APPLIC~4TION AND RECORD existing 1 HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $0.00 Permit Fee Paid $81.00 Park Dedication $0.00 Date 01/02/2008 Final/O.P.00/00/0000 Permit Voided I Parcel Id # 1416210000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permitapplicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. 1 have read and rstand the afore men 'oned information. Signature ~~~~~%~,,~~~JG~~~-~-. D t ~~ p~-.D~ ` Agent/Owner Address W6905 DEERVIEW RD BLACK CREEK ae WI 54106 - 0000 Telephone Number 920-525-5757 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. 00 Plan Approval