Loading...
HomeMy WebLinkAbout0128280-Plumbing (interior) G OSHKOSH ON THE WATER Job Address 2187 W 9TH AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 128280 Owner A & W RESTAURANTS INC Contractor DR HANSEN PLBG. Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Water Softner Floor Drain 9 Local Waste 2 Lndry Tray Clothes Wshr 2 Disposal Bidet - 1 Dishwasher Beer Tap Sump Pump Lab Sink 1 Classrm Sink Sterilizer - 2 Breakrm Sink Dip Well Ejector/Grind Drink Ftn 2 hose bibb Create Date 12/27/2007 Category 440 - Industrial-Interior Plan ZZ2-279-1007-P Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn 3 Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Interior plumbing for new A&W per plan approval. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1311830100 Valuation Issued By $15,000.00 $0.00 Permit Fees Plan Approval $161.00 0 Permit Voided I Date 12/27/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 55 KNAPP ST OSHKOSH WI 54902 - 3448 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.