Loading...
HomeMy WebLinkAboutCompliance Statement ~ \/. ~-!' Compliance Statement This form is required to be submitted by the architect, engineer, or HV AC desi~ner (supervising professional) observing construction of projects within buildings with total volumes exceeding 50,000 cubic feet and construction of antennas, towers and bleachers (llHR 50.10). Failure to submit this form may result in penalties as specified in IlHR 50.26 and/or local ordinances. General Instructions: Prior to the initial occupancy of new buildings or aJ!4' e~ occupancy of altered existing buildings, submitthls completed ana signeH1:if il1\to~ The municipal building inspection office and also to DILHR, Safety and Buildings, P.O. Box 7969, Madison, WI 53707 JUV Personally identifiable information may be used for other purposes. .~.. " 7? 1994. 1. PROJECT INFORMATION: (Use the DllHR or municipal project label, or type cfftP;~ll}t.!tl:ie'lNo~,O,l~tion.) 'Q1J'(lf.dFII,~', ,., if ('~'~'.:.}j' ,:j,'" Owner Information ProjeCt'tnfqf",ati~~:iiii / Name Bui lng "upancy apter s & Use '" '- III Ll.j "i.. . Cha ter 54 Furni ture store1i:--~!,,- Tenant Name I any Wallace Furniture BUI 109 Location num r & street 30u Koeller Road the final II ~ 7 ftf ~" <;; ~ COMPLIANCE STATEMENT LABEL STORE LANDMARK UNLlMITED PARTNERSHIP III 300 KOELLER RD OSHKOSH 92-09-0185-8 A0004424 r\ E 1&1 City 0 Village 0 Town of Oshkosh Building Project I 92097 H\/AC Project I 2. PURPOSE OFTHIS STATEMENT: (Check Box.A"B, or <;to indicate purP9se and comp'lete any other applicable boxes and InTOrmatlon. Attach additional pages If necessary.) o Building and HVAC ~ Building Only 0 H\/AC Only o Piutial Completion r Description of.Portion Completed A) ~Statement of Substantial Compliance To the st of my knowledge. beli~f, and ba~d on on~ite obs~rvation. construction of the foll~~in~ building and/or HVAC item. .pplicable to this pro ct have been completed In substantial compliance With the approved plans and speclflc.tlons. ~UllDING ITEMS . 1. Structural system including submittal and erection of all uilding components (trusses, precast, metal building, etc.) 2. Fire protection systems (sprinklers, alarms, smoke detectors) designed and installed by appropriately registered professionals 3. Exits including exit and directional lights 4. Shaft and stairway enclosures 5. Fire-resistive construction, enclosure of hazards, fire walls, labeled doors, class of construction 6. Sanitation system (toilets, sinks, drinking facilities) 7. IlHR barrierfree requirements 8. All conditions of building plan approval and applicable variances The following items are not in compliance and must be addressed: o HVACITEMS 1. HV AC system including final test (IlHR 64.53) 2. All conditions of HVAC plan approval and applicable variances B) 0 Statement of Noncompliance Due to the following listed violations, this project is not ready for occupancy: C) 0 Supervising Professional Withdrawn From Project (Use A or B above to indicate project status as of this date.) Date Withdrawn VAC Supervising Profenional Date ng Supervising Professional SBD-9720 (R. 01194)