HomeMy WebLinkAbout0128165-Building
e
OSHKOSH
ON THE WATER
Job Address 326 W 17TH AVE
CITY OF OSHKOSH No 128165
BUILDING PERMIT - APPLICATION AND RECORD
Owner JULIE A WYNVEEN Create Date 11/26/2007
Designer
Contractor MARC'S REMODELING
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
. Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFR / Remove 2nd replace kitchen countertops, installing cabinet for sink, and enclose bath window.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
$1,800.00 Plan Approval
$32.00 Park Dedication
$0.00
Fees: Valuation
Issued By: ~.Y"
$0.00 Permit Fee Paid
Date 12/14/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcel Id # 0908330000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read ~.u.n nad~ t~(1O d m thee a arfcor me 'oned information.
Signature ~ ~ ~
Date
\d-\\'-\ \al
1805 MARQUETTE AVE
OSHKOSH
WI 54901 - 0000 Telephone Number 920-426-0671 OR 41'
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.