HomeMy WebLinkAboutPlumbing #H3-14-294-P
March 4, 1994
M. P. Kelly Plumbing & Heating, Inc.
665 N. Main Street
Oshkosh, WI 54901
RE: Seven-Up & RC Bottling Co. of Oshkosh
H3-14-294-P
Gentlemen:
Examination of the plumbing plans and specifications for the
abovementioned project has been completed.
In accord with Chapter 145, Wisconsin Statutes, and ILHR 81 through
85, Wisconsin Administrative Code, the plumbing plans and
specifications are approved contingent upon compliance with the
stipulation noted below:
1. ILHR 82.35 Cleanout - Double sanitary tees.
The architect, professional engineer, registered designer, owner
or plumbing contractor shall keep, at the construction site, one
set of plans bearing the stamp of approval.
In the event installation of this plumbing system has not commenced
within two years from this date, this approval shall become void.
A new application accompanied by full examination fee shall be
filed and an updated received before work may commence.
In granting this approval, the City of Oshkosh or its
representative does not hold itself liable for any defects in plans
of specification, plan omissions, examination oversight,
construction or any damage that may result in or after installation
and reserves the right to order changes or additions should
conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing
permi t from the Ci ty of Oshkosh before proceeding wi th actua I
installation of this plumbing system or any of its parts.
Sincerely,
WALTER CALLIES
Plumbing Inspector