Loading...
HomeMy WebLinkAbout0122751-Plumbing (water heater) D CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 356-386 S KOELLER ST No 122751 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner LANDMARK LIMITED PARTNERSHIP III Create Date 11/30/2006 Category 440 - Industrial-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor D.R. HANSEN PLBG. Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By INSTALL REPLACEMENT WATER HEATER FOR "U-BAKE" TENNANT 374 S KOELLER***DEBIT ACCOUNT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0608770000 $500.00 Plan Approval $0.00 Permit Fees $25.00 D Permit Voided I Date 11/30/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 233-1595 Address 55 KNAPP ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received; Work may continue if the inspection is not performed within two business days from the time the project is ready.