HomeMy WebLinkAbout0122751-Plumbing (water heater)
D CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 356-386 S KOELLER ST
No
122751
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Owner LANDMARK LIMITED PARTNERSHIP III Create Date 11/30/2006
Category 440 - Industrial-Interior Plan
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest Flr/Wst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Contractor D.R. HANSEN PLBG.
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Valuation
Issued By
INSTALL REPLACEMENT WATER HEATER FOR "U-BAKE" TENNANT 374 S KOELLER***DEBIT ACCOUNT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0608770000
$500.00 Plan Approval
$0.00 Permit Fees
$25.00 D Permit Voided I
Date 11/30/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number 233-1595
Address 55 KNAPP ST
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received; Work may
continue if the inspection is not performed within two business days from the time the project is ready.