Loading...
HomeMy WebLinkAboutBuilding W1-109-1106 '''!! ~ OJHKOfH City of Oshkosh Division of Inspection Services 215 Church Avenue PO Box 1130 Oshkosh WI 54903-1130 www.ci.oshkosh.wi.us ON THE WATER November 13,2006 Richard Fisher 642 Tholsen Drive Kimberly WI 54136 Ron Detjen Landmark LTD III PO BOX 2366 Oshkosh WI 54903 Site: Plan Number: WI-I09-1106 U Bake 374 S Koeller St. Oshkosh WI 54903 For: Description: Tenant space alterations Object Type: Building only Class of Construction: lIB -1653 Sq Ft.; Srinklered Occupancy: M: Mercantile / Retail The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defmed in Chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements Key Item(s) / Conditions: . IBC 901.2 Fire protection systems shall be installed, repaired, operated and maintained in accordance with this code and the international fire code. (Construction of new walls may require the addition and or relocation of sprinkler heads to maintain required coverage, and not obstruct spray patterns of fire sprinklers) . IBC 906.1/ IFC 906.3 The maximum travel distance allowed to a fire extinguisher is 75 feet. . IBC 1003.2.11 Means of egress illumination is required to be installed per this section. All paths of egress are required to have adequate emergency lighting to meet the performance requirements of IBC 1003.2.11.3. Existing means of egress emergency lighting is permitted to be maintained in compliance with the code in effect at the time of construction. Any altered path of egress, or new path of egress, and any new emergency lighting being installed is required to comply with current code requirements. . Comm 61.30(3) This review does not include lighting. Comm 63.0001 Prior to installation, lighting plans and calculations shall be prepared in compliance with the code. The plans shall be available upon request. . Comm 61.30(3) / IMC 507.2 This plan review does not include heating, ventilation, or air conditioning. HV AC plans are required to be submitted and approved prior to installation ofHV AC equipment. Review\W 1..11)<).1 Bklg Only..doc Page I of2 .... . Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve rules under this code and which are made to construction documents that have previously been granted approval by the department or its authorized representative, shall be submitted to the office that granted the approval. All revisions and modifications to plans shall be approved in writing by the department or its authorized representative prior to the work involved in the revision or modification being carried out. A revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with Comm 61.3l(1). . Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional shall file a compliance statement form SBD-9720 with this office. A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to be obtained prior to commencement of work. In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. Inquiries concerning this correspondence may be made to me at the number listed belowor the address on this letterhead. Bna oe Building Systems Consultant (920) 236-5051 Monday - Friday 7:30 A.M. to 8:30 A.M and 12:30 A;M to 1:30 P.M. bnoe@ci.oshkosh.wi.us cc: Property file Fee Required $ Fee Received $ Balance Due $ 320.00 320.00 0.00 \\OSJIKOSI IMISFSiUSEI(S'':y:;tnn -20! Iii (ornm I'hm Heview\\V I - IOil-I! 06374 5 Ke>dle" St Only.dot: Page 2 of2