November 13,2006
Richard Fisher
642 Tholsen Drive
Kimberly WI 54136
Ron Detjen
Landmark LTD III
PO BOX 2366
Oshkosh WI 54903
Site: Plan Number: WI-I09-1106
U Bake
374 S Koeller St.
Oshkosh WI 54903
For:
Description: Tenant space alterations
Object Type: Building only
Class of Construction: lIB -1653 Sq Ft.; Srinklered
Occupancy: M: Mercantile / Retail
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defmed in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements
Key Item(s) / Conditions:
. IBC 901.2 Fire protection systems shall be installed, repaired, operated and maintained in accordance with
this code and the international fire code. (Construction of new walls may require the addition and or
relocation of sprinkler heads to maintain required coverage, and not obstruct spray patterns of fire
sprinklers)
. IBC 906.1/ IFC 906.3 The maximum travel distance allowed to a fire extinguisher is 75 feet.
. IBC 1003.2.11 Means of egress illumination is required to be installed per this section. All paths of egress
are required to have adequate emergency lighting to meet the performance requirements of IBC
1003.2.11.3. Existing means of egress emergency lighting is permitted to be maintained in compliance
with the code in effect at the time of construction. Any altered path of egress, or new path of egress,
and any new emergency lighting being installed is required to comply with current code requirements.
. Comm 61.30(3) This review does not include lighting. Comm 63.0001 Prior to installation, lighting
plans and calculations shall be prepared in compliance with the code. The plans shall be available upon
request.
. Comm 61.30(3) / IMC 507.2 This plan review does not include heating, ventilation, or air
conditioning. HV AC plans are required to be submitted and approved prior to installation ofHV AC
equipment.
Review\W 1..11)<).1
Bklg Only..doc
Page I of2
....
. Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve
rules under this code and which are made to construction documents that have previously been granted
approval by the department or its authorized representative, shall be submitted to the office that granted the
approval. All revisions and modifications to plans shall be approved in writing by the department or its
authorized representative prior to the work involved in the revision or modification being carried out. A
revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with
Comm 61.3l(1).
. Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional
shall file a compliance statement form SBD-9720 with this office.
A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to
be obtained prior to commencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structure, or component.
Inquiries concerning this correspondence may be made to me at the number listed belowor the address on this letterhead.
Bna oe
Building Systems Consultant
(920) 236-5051 Monday - Friday 7:30 A.M. to 8:30 A.M and 12:30 A;M to 1:30 P.M.
bnoe@ci.oshkosh.wi.us
cc: Property file
Fee Required $
Fee Received $
Balance Due $
320.00
320.00
0.00