Loading...
HomeMy WebLinkAboutBuilding C4-129-895 CITY HALL 215 Church Avenue P. O. Box 1130 Oshkosh, Wisconsin 54902-1130 City of Oshkosh ~ O./"Hl<OJH August 10, 1995 Landmark Unlimited Partnership III 304 Ohio street Oshkosh, WI 54901 James Larson 600 South Main street Oshkosh, WI 54901 Re: 372 Soutl1 K:9teJ,.le!:, St!:',tetet Rexall Show Case store File# C4-129-895 Dear Sir: Building plans have been reviewed by this office for compliance with important code requirements. The drawings are stamped "Construction may proceed." All items that are required to be changed by this letter must be corrected before commencing that part of the work. This approval is not a Building Permit. Necessary city permits must be secured before commencing work. You are hereby advised that the owner, as defined in Chapter 101.01(i) of the Wisconsin state Statutes, is responsible for all code requirements not specifically cited herein. Code requirements are set forth in Chapters 50 through 64 of the rules of the Department of Industry, Labor and Human Relations. The building will be inspected during construction and a final inspection will be made after completion to insure complete compliance with city and state codes. The architect, professional engineer, builder or owner shall keep at the building, as evidence of approval, one set of plans bearing the stamp of approval. ILHR 64.02 This approval does not include heating and ventilating. Such plans are required to be submitted and approved prior to installation of such equipment. Sincerely, Allyn Dannhoff Director of Code Enforcement