Loading...
HomeMy WebLinkAboutBuilding Compliance Statement Compliance Statement This form is required to be submitted by the architect, engineer, or HVAC desisner (supervising professional) observing construction of projects within buildings with total volumes exceedmg 50,000 cubic feet and construction of antennas, towers and bleachers (lLHR 50.10). Failure to submit this form may result in penalties as specified in ILHR 50.26 and/or local ordinances. General Instructions: Prior to the initial occupancy of new buildings or additions and the final occupancy of altered existing buildings,. submit this completed and signeg,;~qs01 . M, ' The municipal building inspection office and also to n~~ i.":~ I DILHR, Safety and Buildings, P.O. Box 7969, Madison, WI 53707 <, ....... , Personally identifiable information may be used for other purposes. , . (~ ,c: 0 I 9 1994- 1. PROJECT INFORMATION: (Use the DllHR or municipal project label, or type or print the infurmation.) Owner Information Project Infor",,~iQ1).;'Tf;G i. ,~" ~".", t'" ~ ~ t ,I if ~ t. Bui ing Occupancy C apter s &.U~} Vi; ~ h t'ai~t" Tena C!;;l ~ all: A BUI 300 Koeller IZI City 0 Village RETAIL LANDMARK UNLIMITED PARTNERSHIP III SHELL & SUITE 1 & 300 .~LLER ROAD (ISHKClSH 94-03-0046-B A0004424 E Name an PHASE II of Oshkosh Name COMPLIANCE STATEMENT LABEL Building Project # 94012 HVAC Project # 2. PURPOSE OF THIS STATEMENT: (Check Box At,B, orCto indicate purpose and comp'lete any other applicable boxes and imormation. Attach additional pages If necessary.) o Building and HVAC ~g Only 0 HVAC Only o Partial Completion Description of,Portion Completed ". ... . A) ~tement of Substantial Compliance To th~S;O~~y knowledge. belief, and based on on site observation. construction of the following building and/or HVAC items applicable to this project have been completed in substantial compliance with the approved plans and specifications. ~iLDING ITEMS 1. Structural system including submittal and erection of all building components (trusses, precast, metal building, etc.) 2. Fire protection systems (sprinklers, alarms, smoke detectors) designed and installed by appropriately registered professionals 3. Exits including exit and directional lights 4. Shaft and stairway enclosures 5. Fire-resistive construction, enclosure of hazards, fire walls, labeled doors, class of construction 6. Sanitation system (toilets, sinks, drinking facilities) 7. IlHR barrier free requirements 8. All conditions of building plan approval and applicable variances The following items are not in compliance and must be addressed: o HVACITEMS 1. . HV AC system including final test (ILHR 64.53) 2. All conditions of HVAC plan approval and applicable variances vt0- ~ 'fk r~~ - ~ ~\~ B) 0 Statement of Noncompliance Due to the following listed violations, this project is not ready for occupancy: C) 0 Supervising Professional Withdrawn From Project (Use A or B above to indicate project status as of this date.) Date Withdrawn D) 0 Abandoned ~ATU:~~: _ Building Supervising Professional SBD.9720 (R. 01194) '11%14, CS "f' I . Date HVA upervlslOg Pro eSSlona Date