HomeMy WebLinkAbout0104010-Building (deck)OSHKOSH
ON THE WATER
Job Address 6t9 FREDERICK ST
Designer
Category
Type
Zoning
142 - Decks, Patios, Ramps
Building (~ Sign
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAEL L/STEPH PATTERSON JR Create Date
Contractor OWNER
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation ~ Poured Concrete ~) Floating Slab
(~ Concrete Block (~) Post
Occupancy Permit
Park Dedication
No 104010
09/08/2003
(~ Canopy ~) Fence
Class of Const:
Rooms 0 Height
Bedrooms 0 Stories
Baths 0
(~ Pier (~ Other
(~ Treated Wood
Flood Plain
# Dwelling Units 0
Plan
Raze
0 Ft,
Size
[] Projection
Canopies 0
Signs 0
Height Permit
# Structures 0
Use/Nature SFPJ Constructing a 21' x 27' deck on the rear of the house. The deck shall not be closer to the side property line than the current
of Work setback of the house.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: (~
$3~200.00 Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided
Plumbing Contractor
$35.00 Park Dedication $0.00
Date 09/08/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh h~ no authority to enforce easement restrictions of which it is not a party, if you perform the work
per~it~p~.ation/~t,llCir~n easement, the City strongly urges the permit applicant to contact the easement
described
in
this
Signature ~/~ ////~~ '-"~ Date ~'
/ ' ~ ' AgenF~ner
Address ~65 DOBBERKE LN NEENAH WI 54956 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPUANCE CHECKI.JST
JOB LOCATION: ~1~
PROPERTY OWNER/CONTRACTOR:
CONSTRUCTION DATA:
TYPE OF CONSTRUCTION:
New Construction
(i.e. fence, pool, parking lot, sign, etc.)
ZONING
Addition Alteration
COMPLIANCE CHECKLIST
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
. Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc.,
when the use is confo~ning and when no change is proposed.
~ APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEVVED BY: ~
DATE: ~/0,~,~