HomeMy WebLinkAbout0121798-Plumbing (added fixtures)
o
OSHKOSH
ON THE WATER
Job Address 356-386 S KOELLER ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner LANDMARK LIMITED PARTNERSHIP III
Contractor R J PARINS PLUMBING AND HEATING INC
Category 440 - Industrial-Interior
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature Fixtures added to work under permit #121718.
of Work
No 121798
Create Date 09/28/2006
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$5,300.00 Plan Approval
Ct\?rvC)
$0.00
$14.00 0 Permit Voided I
Permit Fees
Issued By
I
I
Parcel Id #
0608770000
Date 09/29/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 2860 W MASON
Agent/Owner
GREEN BAY
WI 54313 - 0000 Telephone Number 920-494-9159
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.