Loading...
HomeMy WebLinkAbout0121796-Building o CITY OF OSHKOSH No 121796 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 356-386 S KOELLER ST Owner LANDMARK LIMITED PARTNERSHIP III Create Date 09/28/2006 Designer Contractor DO IT RIGHT CONSTRUCTION Category 223 - Alteration Offices, Banks, Professional Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: 2Bibc Size NO CHANGE Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I FinishedlLiving Sq.Ft. Sq. Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o UselNature 362 S Koeller - The Barber Shop - Remodel for new tenant.* Late Permit. All wood framing to be removed. New framing not to be of Work 3nclosed until inspected and approved. HV AC Contractor Plumbing Contractor Electric Contractor Fees: valuat~ Issued By: J $33,000.00 Plan Approval $0.00 Permit Fee Paid $287.00 Park Dedication $0.00 Date 09/29/2006 FinaJIO.P. 00/00/0000 o Permit Voided I Parcelld # 0608770000 In the performance of this work I agre to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no hority to enforce easement restrictions of which it is not a party, if you perform the work described in this per . pplicatio within an easement, the City strongly urges the permit applicant to contact the easeme~t holder(s) and to s cur any ne ssary approvals before starting such activity. c: ~ Signature Date ~ Agent/Owner Address 3316 HUCKLEBERRY LN OSHKOSH ~ 54915 - 0000 Telephone Number 920-882-8616 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the prQject is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.