HomeMy WebLinkAbout0121796-Building
o CITY OF OSHKOSH No 121796
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 356-386 S KOELLER ST Owner LANDMARK LIMITED PARTNERSHIP III Create Date 09/28/2006
Designer
Contractor
DO IT RIGHT CONSTRUCTION
Category
223 - Alteration Offices, Banks, Professional
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const: 2Bibc
Size NO CHANGE
Unfinished/Basement
Sq. Ft.
Rooms
Height Ft.
o Projection I
FinishedlLiving
Sq.Ft.
Sq. Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
UselNature 362 S Koeller - The Barber Shop - Remodel for new tenant.* Late Permit. All wood framing to be removed. New framing not to be
of Work 3nclosed until inspected and approved.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: valuat~
Issued By: J
$33,000.00 Plan Approval
$0.00 Permit Fee Paid
$287.00 Park Dedication
$0.00
Date 09/29/2006
FinaJIO.P. 00/00/0000
o Permit Voided I
Parcelld # 0608770000
In the performance of this work I agre to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no hority to enforce easement restrictions of which it is not a party, if you perform the work
described in this per . pplicatio within an easement, the City strongly urges the permit applicant to contact the easeme~t
holder(s) and to s cur any ne ssary approvals before starting such activity. c: ~
Signature Date ~
Agent/Owner
Address 3316 HUCKLEBERRY LN OSHKOSH ~ 54915 - 0000 Telephone Number 920-882-8616
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the prQject is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.