Loading...
HomeMy WebLinkAboutBuilding & HVAC G2-101-1102 iY CITY HALL Inspection Services Div 215 Church Avenue PO Box 1130 ~ O,h'o,h WI ~ 54903-1130 OfHKOfH ON THE WATER City of Oshkosh November 11 th, 2002 Clark Meyer Larson - Meyer Architects LLC 600 8 Main 8t Oshkosh, VVI54902 Re: Planned Parenthood Alteration / Occupancy B 378 8 Koeller Street File # G2-101-1102 The above-reference plans have been stamped CONDITIONALLY APPROVED based upon review for conformance to the current edition ofthe VVisconsin Administrative Building and Heating, Ventilating and Air Conditioning Code, chapters COMM 61-65. These plans have NOT been reviewed for conformance to the Plumbing Code (ch. COMM 16) and any COMM code not specifically mentioned. This approval is not a Building Permit. Necessary city permits must be secured before commencing work. You are hereby advised that the owner, as defined in Chapter 101.01 (I) of the VVisconsin State Statutes, is responsible for all code requirements not specifically cited herein. Code requirements are set forth in Chapters 61 through 65 ofthe rules ofthe Department of Commerce. The building will be inspected during construction and a final inspection will be made after completion to insure compliance with city and state codes. The architect, professional engineer, builder or owner shall keep at the building as evidence of approval, one set of plans bearing the stamp of approval. COMM 62.11 09(5) Provide Handicap Accessible source of drinking water. Drinking facilities must be provided per COMM 62.2902.1, Table 2902.1.