HomeMy WebLinkAboutPlumbing #H6-681 (phase 1)
June 20, 1981
A"
Gary Adams
1570 N. Oakwood Road
Oshkosh, "11 54901
RE
Plumbing Plan Approval for First Phase
of 182.6 Harrison Street/Plan ID fln6-681
Gentlemen:
Examination of the plumbing plans and specifications for the above-mentioned
project has been completed.
In accord with Chapter 145, Hisconsin Statutes, and Chaptf2r 1:162, Wisconsin
Admil11.strative C<?de? ,tllC plumbing plans and specifications are a.pproved
contingent upon compliance with the stipu1ati,on noted below:
1) Plumbing Plan is in reasonable compliance with State and local
plumbing la,,rs.
The architect, professional engineer, registered designer, owner or plumbing
contractor shall keep, at the constructIon site, one set of plans beari.ng the
stamp of approval.
In the event i~stallation of this plumbing system has not commenced within
two years from this date, this approval shall become void. A ne\\I application
accompanied by full examination fe~ shall be filed and an updated approval
received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not
hold itself liable for any defects in plans or specifications. plan omissions,
examination oversight. construction or any damage that may result in or after
instal]~tiou and reserves the right to order changes or additions should con-
ditions arise making thIs necessary.
It shall be necessary for installing plumber to obtain a plumbing permit from
the City of Oshkosh before proceeding 'with actual installation of this plumbing
system or any of its parts.
Sincerely,
HARVIN HIGI,EY
Plumbing Superv:tsor
HHsj j /9561