HomeMy WebLinkAbout0128104-Building (exterior)
G
OSHKOSH
ON THE WATER
Job Address 420 E MELVIN AVE
CITY OF OSHKOSH No 128104
BUILDING PERMIT - APPLICATION AND RECORD
Owner GERALD A ARMS Create Date 09/05/2007
Contractor ASHTON CONSTRUCTION
Designer
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Signs
Garage
Baths
Foundation
o Poured Concrete 0 Floating Slab
. Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFR /Install new gutters,-exterior tuckpointing, replace -side and' rear primary doors, and side and rear storm doors.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
$2,540.00 Plan Approval
$0.00 Permit Fee Paid
$39.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
(77
Date 12/10/2007 Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1008790100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit app' ication within an e e~nt, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu a nece ary r sj'efore starting such activity.
I have read and u. st 9 the for a:nation.
/1 /
Signature .
Agent/Owner
OSHKOSH
DatCvQ.-IO -6'1
Address 5308 COUNTY ROAD R
WI 54902 - 8504
Telephone Number
(920) 233-0870
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.