Loading...
HomeMy WebLinkAbout07-363 DECEMBER 11, 2007 07 -363 RESOLUTION (CARRIED 1-0 LOST LAID OVER WITHDRAWN ) PURPOSE: CHANGE ORDER NO.4, PUBLIC WORKS CONTRACT NO. 06-08 ($64,821.40) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: LaLonde Contractors, Inc. PO Box 070420 Milwaukee, WI 53207 Net Increase to contract: $64,821.40 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 315-0410-7480-00000 -- Street Improvement Fund Expenditures Acct. No. 541-1810-1799-00000 -- Water Utility-Construction in Progress TO: LaLonde Contractors, Inc. P. O. Box 070420 Milwaukee, WI 53207 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET INCREASE TO: SECTION 1- ROADWAY ITEMS NET DECREASE TO: SECTION II - ELECTRICAL ITEMS NET DECREASE TO: SECTION III - STORM SEWER ITEMS NET DECREASE TO: SECTION IV - SANITARY SEWER ITEMS NET INCREASE TO: SECTION V - WATER MAIN NET INCREASE TO CONTRACT: Recommended: Director of Public Works CHANGE ORDER # 4 \lt~ DATED: December 4, 2007 06-08 , is hereby amended $24,045.58 ($5,123.50) ($10,133.40) ($531.79) $56,564.51 $64,821.40 CITY OF OSHKOSH BY: City Manager City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller CONTRACT: 06-08 CHANGE ORDER # 4 SECTION 1- ROADWAY ITEMS ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANT/TIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Clearing & Grubbing, lump $800.00 sum 1.00 1.00 2 Remove approx. 385 linear ft. of Curb & Gutter, per linear ft. 385.00 306.00 -79.00 $4.00 ($316.00) 3 Remove approx. 4,400 square yards of existing Pavement, per square yard 4,400.00 4,086.00 -314.00 $3.75 ($1,177.50) 3a Remove approx. 750 square yards of existing Concrete Sidewalks and Driveways, per square yard 750.00 309.00 -441.00 $3.00 ($1,323.00) 3b Remove approx. 27 existing Light Poles & Concrete Bases, each 27.00 29.00 2.00 $150.00 $300.00 3c Remove Sign and Base, Station 496+99, lump sum 1.00 1.00 $3,000.00 4 Obliterate nine (9) Old Roadway, per STA (100 ft.) 9.00 9.00 $300.00 5 Approx. 19,247 cubic yards of Common Excavation, per cubic yard 19,247.00 22,149.00 2,902.00 $4.08 $11,840.16 6 Approx. 15,200 square yards of 8-lnch Doweled Concrete Pavement wI Integral Curb & Gutter and 6-lnch Base Course, per square yard 15,200.00 14,734.00 -466.00 $30.95 ($14,422.70) 7 Furnish and install approx. 50 Dowel Bars, each 50.00 25.00 -25.00 $12.00 ($300.00) 8 Furnish and install approx. 80 Pavement Ties, each 80.00 86.00 6.00 $6.50 $39.00 9 Approx. 460 square ft. of Concrete Median Sloped Nose, per square foot 460.00 627.00 167.00 $5.55 $926.85 10 Approx; 750 square ft. of Concrete Corrugated Median, oer sauare foot 750.00 858.00 108.00 $5.75 $621.00 11 Approx. 2,135 linear ft. of Concrete Curb & Gutter, 30 Inch, per linear ft. 2,135.00 2,090.00 -45.00 $8.38 ($377.10) 12 Approx. 375 linear feet of 8 x 18 Inch Concrete Curb, oer linear ft. 375.00 351.00 -24.00 $22.00 ($528.00) 13 Approx. 13,500 square ft. of Concrete Sidewalk, 4- Inch, per square foot 13,500.00 12,205.00 -1,295.00 $2.49 ($3,224.55) Page 1 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPT/ON CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 14 Approx. 2,650 square ft. of Concrete Sidewalk & Driveway, 6-lnch, per square foot 2,650.00 3,993.00 1,343.00 $3.08 $4,136.44 15 Approx. 300 square yards of 6-lnch Base Aggregate Dense, Driveway, per square yard 300.00 250.00 -50.00 $3.50 ($175.00) 16 Approx. 64 square ft. of Detectable Warning Field, . loer square foot 64.00 64.00 $32.00 17 Approx. 500 square yards of Asphaltic Surface for Driveways, 4-lnch, per square vard 500.00 . 538.00 38.00 $20.20 $767.60 18 Approx. 1,200 square . yards of Asphaltic Surface Transition and 10-lnch Base Course, per square yard 1,200.00 1,222.00 22.00 $18.95 $416.90 19 Approx. 800 linear ft. of 6- Foot Wide Base Aggregate Dense Shoulder, per linear ft. 800.00 789.00 -11.00 $4.45 ($48.95) 20 Approx. 6,500 square ft. of Paving Brick w/4-lnch Co.ncrete Subbase and Leveling Sand, per square foot . 6,500.00 5,671.00 -829.00 $8.04 ($6,665.16) 21 Approx. 18,000 square yards of 6-lnch Pulverized Topsoil, Seed, Fertilize & Erosion Mat, per square yard 18,000.00 20,000.00 2,000.00 $3.85 $7,700.00 21a Approx. 1,650 square yards of 6-lnch Pulverized Topsoil, Prairie Seed, Fertilize & Erosion Mat, per sauare yard 1,650.00 1,771.00 121.00 $3.85 $465.85 22 Approx. 150 square yards of Median Topsoil and Hardwood Mulch, per sauare'vard 150.00 135.00 -15.00 $8.00 ($120.00) 23 Approx. 1,520 linear ft. of Pavement Marking Epoxy, 4~lnch, oer linear foot 1,520.00 4,042.00 2,522.00 $0.35 $882.70 24 Approx. 1,650 linear ft. of Pavement Marking Paint, 4 Inch, oer linear foot 1,650.00 0.00 -1,650.00 $0.35 ($577.50) 25 Approx. 1,170 linear ft. of Pavement Marking Epoxy, 8-lnch, per linear ft. 1,170.00 1,262.00 92.00 $0.60 $55.20 Page 2 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANT/TIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 26 Approx. 350 linear ft. of Pavement Marking Crosswalk Epoxy, 6-lnch, oer linear ft. 350.00 337.00 -13.00 $4.50 ($58.50) 27 Approx. 80 linear ft. of Pavement Marking Stop Line Epoxy, 18-lnch, linear ft. 80.00 127.00 47.00 $6.10 $286.70 28 Approx. ten (10) Pavement Marking Words Epoxy, "ONLY", each 10.00 10.00 . $140.00 29 Approx. two (2) Pavement Marking Arrows Epoxy, Tvoe 1, each 2.00 2.00 $110.00 30 Approx. 14 Pavement Marking Arrows Epoxy, Tyoe 2, each 14.00 14.00 $130.00 31 Approx. 300 square ft. of Pavement Marking Concrete Corrugated Median Epoxy, per square foot 300.00 563.00 263.00 $2.00 $526.00 32 Traffic Control, Temporary, lump sum 1.00 1.00 $1,250.00 33 Traffic Control, Permanent, lumo sum 1.00 1.00 $2,000.00 34 Approx. 2,000 linear ft. of Silt Fence, per linear ft. 2,000.00 1,820.00 -180.00 $1.50 ($270.00) 35 Approx. 40 Inlet Protection, each 40.00 42.00 2.00 $30.00 $60.00 36 Approx. two (2) Erosion Control Tracking Mats, each 2.00 1.00 -1.00 $650.00 ($650.00) 37 Approx. 60 linear ft. of Temporary Rock Ditch Check, oer linear ft. 60.00 179.00 119.00 $8.00 $952.00 38 Approx. 350 ton of Riprap, Medium, per ton 350.00 360.00 10.00 $24.00 $240.00 39 Approx. 260 square yards of Geotextile Fabric, Type R, per square yard 260.00 411.00 151.00 $4.00 $604.00 40 Approx. 780 linear ft. of Sawing Existing Pavement, loer linear ft. 780.00 314.00 -466.00 $1.25 ($582.50) 41 Approx. 215 linear ft. of Sawing Concrete Pavement, Full Depth, per linear ft. 215.00 319.00 104.00 $3.00 $312.00 SECTION 1- (BID ITEMS 1 -41) - SUB-TOTALS $31,132.40 ($30,816.46) Page 3 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE ADDITIONAL WORK REQUIRED: C.O. # 4- SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANT/TIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Additional cost of labor & materials for misc. paving items as follows: reinforcing bars over utility trenches, reinforcing rods at control joints, thickened asphalt sections at asphalt tie-in locations, traffic control at south end, and removal and resetting rural mail boxes, per invoice dated 11/28/07, lump sum 1.00 1.00 $4,022.79 $4,022.79 2 Additional cost of labor and materials for misc. concrete paving items as follows: 12" wide radius curb head, 8" concrete sidewalk and driveway aprons, 30" curb & gutter, 8" dowels concrete pavement, and 6" H.E.S. concrete driveway apron, per invoice dated 11/28/07, lumo sum 1.00 1.00 $16,456.22 $16,456.22 3 Additional cost of labor & materials for misc. erosion control items as follows: Seed, fertilizer, mulch temporary ditch, and erosion mat adjacent to McDonald's driveway, per invoice dated 11/28/07, lumo sum 1.00 1.00 $2,042.13 $2,042.13 4 Additional cost of labor & materials for misc. delays of grading near Racette Ford property and inlet installation 403.3, per invoice dated 11/28/07, lumo sum 1.00 1.00 $1,208.50 $1,208.50 ADDITIONAL WORK: C.O. # 4 - (ITEMS 1 - 4) - SUB-TOTAL $23,729.64 $0.00 NET INCREASE TO: SECTION I - $24,045.58 Page 4 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE SECTION II - ELECTRICAL ITEMS ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 42 Remove approx. three (3) Concrete Bases, each 3.00 3.00 $75.00 43 Approx. 785 linear ft. of Conduit Rigid Non-Metallic Schedule 40, 2-lnch, per linear ft. 785.00 705.00 -80.00 $5.50 ($440.00) 44 Approx.. 1,255 linear ft. of Conduit Rigid Non-Metallic Schedule 40, 3-lnch, per linear ft. 1,255.00 1,249.00 -6.00 $6.00 ($36.00) 45 Approx. 3,500 linear ft. of Conduit Rigid Non-Metallic Schedule 40, 3-lnch wI Ground Wire, per linear ft. 3,500.00 2,826.00 -674.00 $6.00 ($4,044.00\ 46 Approx. 65 linear ft. of Conduit Special, 3-lnch, loer linear ft. 65.00 71.00 6.00 $15.00 $90.00 47 Approx. 886 linear ft. of Conduit Loop Detector, per linear ft. 886.00 910.00 24.00 $4.00 $96.00 48 Furnish and install approx. five (5) Pull Boxes, Steel, 12 x 24 Inch, each 5.00 4.00 -1.00 $350.00 ($350.00) 49 Furnish and install approx. three (3) Pull Boxes, Steel, 24 x 36 Inch,each 3.00 3.00 $450.00 50 Furnish and install approx. 18 Pull Boxes, Steel, 24 x 42 Inch, each 18.00 17.00 -1.00 $450.00 ($450.00) 51 Approx. two (2) Concrete Bases, Type 1, each 2.00 2.00 $400.00 52 Approx. two (2) Concrete Bases, Type 2, each 2.00 2.00 $600.00 53 Approx. 1,340 linear ft. of Loop Detector Lead In Cable, per linear ft. 1,340.00 1,340.00 $1.00 54 Approx. 2,734 linear ft. Loop Detector Wire, per linear ft. 2,734.00 2,755.00 21.00 $0.50 $10.50 55 Temporary Traffic Signals for Intersections (8TH 21 & Washburn), lump sum 1.00 1.00 $7,500.00 56 Remove approx. three (3) Pull Box Special, each 3.00 3.00 $75.00 SECTION II - (BID ITEMS 42 - 56) - SUB-TOTALS $196.50 ($5,320.00) NET DECREASE TO: SECTION II - ($5,123.50) Page 5 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE SECTION III - STORM SEWER ITEMS ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 57 Remove six (6) Inlets, each 6.00 6.00 $300.00 58 Remove one (1) Manhole, each 1.00 1.00 $500.00 59 Remove approx. 770 linear ft. of Storm Sewer Pipe, Iper linear ft. 770.00 767.00 -3.00 $10.00 ($30.00) 60 Furnish and install 14 Manholes, Tvoe 3, each 14.00 12.00 -2.00 $2,050.00 ($4,100.00) 61 Furnish and install 33 Inlets, Type 3 wI 18-lnch Sumo, each 33.00 31.00 -2.00 $950.00 ($1,900.00) 62 Furnish and install two (2) Inlets, Tvoe 8, each 2.00 2.00 $1,050.00 63 Furnish and install two (2) AEWs for Culvert Pipe, Reinforced Concrete 15- Inch, each 2.00 2.00 $700.00 64 Furnish and install three (3) AEWs for Culvert Pipe, Reinforced Concrete 24- Inch, each 3.00 3.00 $900.00 65 Furnish and install one (1) AEW for Culvert Pipe, Reinforced Concrete 24 x 38 Inch Horizontal Elliotical, each 1.00 1.00 $1,300.00 66 Furnish and install one (1) AEW for Culvert Pipe, Reinforced Concrete 29 x 45 Inch Horizontal Elliptical, each 1.00 1.00 $1,500.00 67 Furnish and install approx. 22 linear ft. of 12-lnch PVC SDR-35 Storm Sewer, per linear ft. 22.00 26.00 4.00 $35.00 $140.00 68 Furnish and install approx. 129 linear ft. of 15-lnch RCP, Class III Storm Sewer, per linear ft. 129.00 137.46 8.46 $30.00 $253.80 69 Furnish and install approx. 388 linear ft. of 15-lnch RCP, Class IV Storm Sewer, per linear ft. 388.00 337.84 -50.16 $30.00 ($1,504.80) 70 Furnish and install approx. 197 linear ft. of 15-lnch RCP, Class V Storm Sewer, per linear ft. 197.00 198.40 1.40 $30.00 $42.00 Page 6 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 71 Furnish and install approx. 18 linear ft. of 15-lnch PVC SDR-35 Storm Sewer, per linear ft. 18.00 0.00 -18.00 $40.00 ($720.00) 72 Furnish and install approx. 295 linear ft. of 18-lnch RCP, Class IV Storm Sewer, per linear ft. 295.00 294.94 -0.06 $33.00 ($1.98) 73 Furnish and install approx. 28 linear ft. of 18-lnch PVC SDR-35 Storm Sewer, per linear ft. 28.00 0.00 -28.00 $45.00 ($1,260.00) 74 Furnish and install approx. 16 linear ft. of 21-lnch RCP, Class IV Storm Sewer, per linear ft. 16.00 0.00 -16.00 $50.00 ($800.00) 75 Furnish and install approx. 55 linear ft. of 24-lnch RCP, Class III Storm Sewer, per linear ft. 55.00 59.87 4.87 $46.00 $224.02 76 Furnish and install approx. 909 linear ft. of 24-lnch RCP, Class IV Storm Sewer, per linear ft. 909.00 907.77 -1.23 $48.00 ($59.04) 77 Furnish and install approx. 115 linear ft. of 24-lnch RCP, Class V Storm Sewer, per linear ft. 115.00 126.26 11.26 $49.00 $551.74 78 Furnish and install approx. 241 linear ft. of 30-lnch RCP,Class IV Storm Sewer, per linear ft. 241.00 209.27 -31 .73 $52.00 ($1,649.96) 79 Furnish and install approx. 252 linear ft. of 24 x 38 Inch RCP Horizontal Elliptical, Class HE-IV Storm Sewer, per linear ft. 252.00 255.50 3.50 $75.00 $262.50 80 Furnish and install approx. 90 linear ft. 0(29 x 45 Inch RCP Horizontal Elliptical, Class HE-IV Storm Sewer, per linear ft. 90.00 95.04 5.04 $83.00 $418.32 81 Pond Outlet Structure, lump sum 1.00 1.00 $2,750.00 SECTION III - (BID ITEMS 57 - 81 ) - SUB-TOTALS $1,892.38 ($12,025.78) NET DECREASE TO: SECTION III - ($10,133.40) Page 7 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE SECTION IV - SANITARY SEWER ITEMS ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 82 Abandon Sanitary Sewer, lump sum 1.00 1.00 $500.00 83 Remove approx. four (4) Sanitary Sewer Manholes, each 4.00 4.00 $500.00 84 Adjust approx. one (1) Sanitary Sewer Manhole, each 1.00 1.00 $300.00 85 Core approx. one (1) existing Manhole & Install " Boot; each 1.00 1.00 $1,900.00 86 Furnish and install approx. nine (9) 48-lnch Precast Sanitary Sewer Manholes, each 9.00 9.00 $2,000.00 87 Metering Manhole, lump sum 1.00 1.00 $70,000.00 , 88 Furnish and install approx. 532 linear ft. of 8-lnch PVC Sanitary Sewer Main, per linear ft. 532.00 533.60 1.60 $65.00 $104.00 89 Furnish and install approx. 1,985 linear ft. of 21-lnch PVC Sanitary Sewer Main; ! oer linear ft. 1,985.00 1,929.81 -55.19 $83.00 ($4,580.77) 90 Furnish and install approx. two (2) 8-lnch Caps, each 2.00 2.00 $25.00 91 Furnish and install approx. one (1) 21-lnch Cap, each 1.00 1.00 $400.00 92 Furnish and install approx. two (2) 21-lnch Plugs, J each 2.00 2.00 $350.00 93 Approx. 100 cubic yards of Rock Excavation, per cubic Iyard 100.00 100.00 $100.00 SECTION IV - (BID ITEMS 82 -93) - SUB-TOTALS $104.00 ($4,580.77) ADDITIONAL WORK REQUIRED: C.O. # 4- SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Additional cost for extra depth of sewer, per linear foot 478.71 478.71 $2.06 $986.14 Page 8 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 2 Reconstruct existing sanitary manhole that was bid to be adjusted, per invoice dated 3/29/06, lumo sum 1.00 1.00 $1,543.52 $1,543.52 3 Additional cost of labor and materials to install flume in field instead of plant in metering manhole, per invoice dated 4/2/07, lump sum 1.00 1.00 $1,415.32 $1,415.32 ADDITIONAL WORK: C.O. # 4 (ITEMS 1 - 4) - SUB-TOTAL $3,944.98 $0.00 NET DECREASE TO: SECTION IV - ($531.79) SECTION V - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 94 Abandon Water Main, lump sum 1.00 1.00 $1,010.00 94a Remove approx. 143 linear ft. of Water Main, per linear ft. 143.00 145.00 2.00 $10.00 $20.00 , 95 Remove approx. three (3) Hvdrants, each 3.00 3.00 $300.00 96 Furnish and install approx. 175 linear ft. of 6-lnch Ductile Iron Class 52 Water Main wI Polywrap, oer linear ft. 175.00 206.60 31.60 $40.00 $1,264.00 97 Furnish and install approx. , 183 linear ft. of 8-lnch Ductile Iron Class 52 Water Main wI Polywrap, .oer linear ft. 183.00 115.50 -67.50 $44.00 ($2,970.00) 98 Furnish and install approx. 1,919 linear ft. of 16-lnch Ductile Iron Class 52 Water Main wI Polywrap, oer linear ft. 1,919.00 1,959.77 40.77 $69.00 $2,813.13 99 Furnish and install approx. six (6) 6 Inch Gate Valves, each 6.00 6.00 $850.00 100 Furnish and install approx. three (3) 8-lnch Gate Valves, each 3.00 2.00 -1.00 $1,000.00 ($1,000.00) 101 Furnish and install approx. five (5) 16- Inch Gate Valves in Standard Water Valve Manhole, each 5.00 6.00 1.00 $6,600.00 $6,600.00 Page 9 CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANT/TIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT , PRICE PRICE 102 Furnish and install approx. one (1) 16- Inch Tapping Valve & Sleeve, each 1.00 3.00 2.00 $11,000.00 $22,000.00 103 Furnish and install two (2) 8-lnch Cap, each 2.00 0.00 -2.00 $95.00 ($190.00) 104 Furnish and install approx. six (6) 16 x 6 Inch Tee, each 6.00 7.00 1.00 $830.00 $830.00 105 Furnish and install approx. one (1) 16 x 16 Inch Tee, each 1.00 2.00 1.00 $1,010.00 $1,010.00 105a Furnish and install approx. one (1) 16 x 8 Inch Tee, each 1.00 1.00 $860.00 106 Furnish and install approx. one (1) 16 x 8 Inch Cross, each 1.00 0.00 -1.00 $1,160.00 ($1,160.00) 107 Furnish and install approx. one (1) 16 x 12 Inch Reducer, each 1.00 1.00 $650.00 108 Furnish and install approx. one (1) 16- Inch PluQ, each 1.00 1.00 $245.00 108a Furnish and install approx. three (3) 8-lnch PluQs, each 3.00 3.00 $50.00 109 Furnish and install approx. six (6) 16-lnch - 11-1/4 Degree Bends, each 6.00 6.00 $800.00 110 Furnish and install approx. eight (8) 16- Inch - 22-1/2 Degree Bends,each 8.00 8.00 $800.00 111 Furnish and install approx. two (2) 16-lnch 45 Degree Bends, each 2.00 3.00 1.00 $800.00 $800.00 112 Not used 113 Furnish and install approx. six (6) Hydrants, each 6.00 7.00 1.00 $2,125.00 $2,125.00 114 Approx. six (6) Gradeloks, each 6.00 5.00 -1.00 $400.00 ($400.00) 115 Approx. 86 linear ft. of 1- Inch Water Service, per linear ft. 86.00 159.00 73.00 $35.00 $2,555.00 116 Furnish and install approx. two (2) 1-lnch Corporation and Stop Box wI Rod, each 2.00 1.00 -1.00 $250.00 ($250.00) Page 10 . .. CONTRACT: 06-08 CHANGE ORDER # 4 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANT/TIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 117 Approx. 850 square ft. of 2 Inch Thick Polystyrene Insulation, per square foot 850.00 384.00 -466.00 $1.00 ($46ELOO) SECTION V - (BID ITEMS 94 -117) - SUB-TOTALS $40,017 .13 ($6,436.00) ADDITIONAL WORK REQUIRED: C.O. # 4 - SECTION V ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRAC PRICE PRICE ?l :J 1 Additional labor and materials to tie in existing watermain at Washburn Ave. and STH 21, per invoices dated 4/4/07 and 4/5/07, lumo sum 1.00 1.00 $4,156.33 $4,156.33 2 Additional labor and materials to excavate, cap and abandon existing 16" watermain in two places as directed by Oshkosh Water Department, per inyoice dated 5/21/07, lump sum 1.00 1.00 $4,055.15 $4,055.15 3 Additional labor and materials to extend water services as directed by Oshkosh Water Department, per invoice dated 5/21/07, lumo sum 1.00 1.00 $3,392.40 $3,392.40 4 Additional watermain pie and fitting required that were not bid as part of this contract, per invoice dated 10/31/07, lumo sum 1.00 1.00 $11,379.50 ' $11,379.50 ADDITIONAL WORK: C.O. # 4 (ITEMS 1 - 4) - SUB-TOTAL $22,983.38 $0.00 NET INCREASE TO: SECTION V _ $56,564.51 - NET INCREASE TO SECTIONS I, II, III, IV, V NET DECREASE TO SECTIONS I, II, III, IV, V $124,000.41 ($59,179.01 ) NET INCREASE TO CONTRACT: $64,821.40 Page 11