HomeMy WebLinkAbout07-360
DECEMBER 11, 2007
07 -360
RESOLUTION
(CARRIED (-o LOST
LAID OVER
WITHDRAWN
)
PURPOSE:
ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT
NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS
(CSM 6157 - ZACHER DRIVE)
DEPARTMENT OF PUBLIC WORKS
INITIATED BY:
BE IT RESOLVED by the Common Council of the City of Oshkosh that the Waiver of
Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the Wisconsin
Statutes, for public improvements and services, for:
CSM 6157 (Lots 1, 2 and 3)
described in the attached Waiver is accepted and approved.
WANER OF SPECIAL ASSESSMENT NOTICES AND
HEARING UNDER SECTION 66.0703, WISCONSIN STATUTES
For private construction and public surveying and inspection for sanitary sewer, storm sewer,
water main, laterals, grading and graveling.
In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I
hereby admit that such public improvement will benefit said property and consent to the levying
of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for
the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I
.hereby waive all special assessment notices and hearings required by Section 66.0703 of the
Wisconsin Statutes; and I further agree and admit that the benefit of my property from the
construction of such improvements is in proportion to the footage thereof: .
Description of Premises
CSM 6157
Lots 1,2 and 3
Extension of Zacher Drive (from the end of the existing Zacher Drive to approx. 188 ft. west
plus temporary cul-de-sac)
1. Sanitary Sewer & Laterals (Private Construction)
Estimated Construction Cost $12,170.00 Private
6% Survey and Inspection $730.20 Invoice
2. Water Main with Laterals (private Construction)
EmimmedConstructionCom $15,685.00 Private
6% Survey and Inspection $941.10 Invoice
3. Storm Sewer with Laterals (private Construction)
Estimated Construction Cost $12,165.00 Private
6% Survey and Inspection $729.90 Invoice
Page 2 - CSM 6157
4. Sidewalk (public Construction) Assess
Assessment Rate = $20.00 per front foot of each lot
Includes 6% for inspection and surveying
Lot # Front Feet Sidewalk Cost Estimate
1 188.03 $3,760.60
2 111.00 $2,220.00
3 77.03 $1,540.60
TOTAL 376.06 $7,521.20
If sidewalk is installed privately the staking & inspection fee is 6% = $451.27 Invoice
5. Grading and Graveling (private)
(Includes temporary cul-de-sac at end of Zacher Dr.)
Center Line Feet of Roadway = 300 If
Cost per Center Line Foot = $65/lf
Estimated Construction Cost
6% Survey and Inspection
6. Concrete Street Paving (public) - Paving in 2010
(Developer to provide paving plans)
Center Line Feet of Roadway = 188.03 If
Cost per Center Line Foot = $140.00/1f
Estimated Construction Cost
6% Survey. and Inspection
Assessments
Lot #
1
2
3
Front Foot
188.03
111.00
77.03
Payment Cost Estimate
$13,162.10
$7,770.00
$5,392.10
$19,500.00
$1,170.00
$26,324.20
$1,579.45
Private
Invoice
Assess
Invoice
Page 3 - CSM 6157
4-Year Irrevocable Letter of Credit For Private Construction = $59,520.00
4-Year Irrevocable Letter of Credit for Public Services = $31,927.00
2- Year Irrevocable Letter of Credit Guarantee After Acceptance of
Private Construction = $11,904.00
Signature of Owner:
~
Signature of Owner:
/6} 11-/07
IDate
/2/4/01
Date