Loading...
HomeMy WebLinkAbout0128061-Building (addition) e OSHKOSH ON THE WATER Job Address 2830 ATLAS AVE CITY OF OSHKOSH No 128061 BUILDING PERMIT - APPLICATION AND RECORD Owner DOWLING INVESTMENTS ATLAS LLC Create Date 12/05/2007 Contractor DOWLING CONSTRUCTION INC Designer Category 210 - Addition Industrial Plan Z6-2103-0907-2 Type . Building o Sign o Canopy o Fence o Raze Class of Const: 2Bibc Size Rooms Height Ft. o Projection I Bedrooms Stories 1 Canopies Baths Signs Zoning M3 Unfinished/Basement Sq. Ft. Finished/Living 21000 Sq. Ft. Garage Sq. Ft. Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures Use/Nature Distribution Warehouse / Work above the foundation for phase II. 21,000 sf addition. of Work . HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $175,000.00 Plan Approval $0.00 Permit Fee Paid $638.00 Park Dedication $0.00 Issued By: Date 12/05/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1329200200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any n es ry a rovals before starting such activity. Agentl~ OSHKOSH Date f 2.. s-- 07 Signature Address PO BOX 3045 WI 54903 - 3045 Telephone Number 235-8021 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.