HomeMy WebLinkAbout0128029-Plumbing (sink)
e
OSHKOSH
ON THE WATER
Job Address 1127 BOWEN ST
CITY OF OSHKOSH
No 128029
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DAVID L BUCHBERGER
Create Date 12/04/2007
Contractor SAMMONS PLUMBING
Category <tJg_:_I3.~~ic:lElnli~:ln~rior__m_~__________ Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower Water Softner Wait. St. Shamp Sink Coffee Maker
Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv Sink Soda Disp
,
____~_________ ,_____._..._ - __________ _~__________.__._.____~.___.___...._,_.._.__"..".____,___u_",_,._____
Use/Nature .SFR / Replace kitchen sink. *'DEBIT ACCT".
of Work
Valuation
Issued By
Size
Material
#
Conn. Type
Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1108760000
___$~9_Q.:00 Plan Approval
()/YJt<)
___$_O.OQ Permit Fees
$25.00 OJ:>E!rr:nit Voided
Date 12/04/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address
Date
522 W. MURDOCK AVE
Agent/Owner
OSHKOSH
WI 54901 - 2298
Telephone Number
231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
~
~l
(: