HomeMy WebLinkAbout0128035-Plumbing (water heater)
G\
OSHKOSH
ON THE WATER
Job Address 2445 W 9TH AVE
:
i
I
I;
CITY OF OSHKOSH
No
128035
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor SAMMONS PLUMBING
Bathtu b
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Owner CORREEN J REDLIN
Create Date 12/04/2007
Category ~"1.1-=-F3Ei~~~enti~I~Y'later 1j~~!Ei~____________ Plan
Wait. St. Shamp Sink Coffee Maker
Ice Chest FlrlWst Sink Int Grease Trap
Exam Sink Catch Basin Ext Grease Trap
Sculry Sink Wash Ftn RPZ Valve
Hand Sink Urinal Eye Wash Statn
Plaster Sink Standp Rec Wtr Sewer Mtrs
Surgeons Sink Ice Maker Deduct Meters
F Prep Sink Gar Drain Wtr Usage Mtrs
Serv Sink Soda Disp
Use/Nature
of Work
r;..-..------ -.".--~-------.---.----~~~------.,----.-.--------.-.-.--------~",..--,.-...------.-.--.-.-
iSFR / Replace gas water heater. **DEBIT ACCT**.
I
I
I
i
Valuation
Issued By
Sanitary Sewer
Material
Type
Conn. Type
Storm Sewer
Water Service
Size
#
Parcelld #
1314710000
$600.00 Plan Approval
------~
---jj)_.gQ
Permit Fees
______$~~:gQ O!'~rn_it~.<>i~~~l
Date 12/04/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
I
~
Signature
WI 54901 - 2298 Telephone Number 231-9880
Address 522 W. MURDOCK AVE
Agent/Owner
OSHKOSH
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
,