Loading...
HomeMy WebLinkAboutState Conditional Approval """'Ii commerce.wi.gov ~i!~9Jl!Jen R E C E' , I V'E 0 2331 SA~~~tl~ a~~ ~~~i~~~ GREEN BAY WI 54304 TOO #: (608) 264-8777 www.commerce.wi.gov/sb/ www.wisconsin.gov NOV 27 2007 .<f DEPARTMENT OF COMMUNITY DEVELOPMENT Jim Doyle, Governor INSPECTION SERVICES DIVISIO~ack L. Fischer,A.I.A., Secretary November 21, 2007 CUST ID No. 271821 ATfN: Buildings & Structures Building Inspector THOMAS R KARRELS THOMAS R KARRELS PES C 1934 ALGOMA BOULEVARD OSHKOSH WI 54901-2104 BUILDING INSPECTION CITY OF OSHKOSH POB 1130 OSHKOSH WI 54902 (Pleaseforward a copy of this letter to the fire department conducting inspections of this project.) CONDITIONAL APPROVAL PLAN APPROVAL EXPIRES: 11/21/2008 SITE: Oshkosh Truck Corporation Defense Plant 2737 Harrison St City of Oshkosh, 54903 ; Fire Dept ID: 7003 FOR: Facility: 685560 OSHKOSH TRUCK CORP DEFENSE PLANT BLDG 2 2737 HARRISON ST OSHKOSH 54903 Transaction lD No. 1480596 Site lD No. 103044 Object Type: Building ICC Regulated Object ID No.: 1160325 Major Occupancy: Factory; Type lIB MetalFrame Unprotected class of construction; Alteration plan; 3,870 project sq ft; Completely Sprinklered; Occupancy:F-l Factory Moderate-Hazard; Sprinkler Design: NFP A-13 Sprinkler; Allowable area determined by: Unseparated Use The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements. The following conditions shall be met during construction or installation and prior to occupancy or use: . Comm 61.36(1)(c) This approval will expire 1 year after the date of this letter if the work covered by this approval is not completed and the building ready for occupancy within that year. A copy of the approved plans, specifications and this letter shall be on-site during construction and open to inspection by authorized representatives of the Department, which may include local inspectors. If plan index sheets were submitted in lieu of additional full plansets, a copy of this approval letter and index sheet shall be attached to plans that correspond with the copy on file with the Department. All permits required by the state or the local municipality shall be obtained prior to commencement of construction/installation/operation. If this construction project will disturb one or more acres of land, an Er<osion Control Notice of Intent (NO!) shall be filed with the department 7 days prior to any earth disturbing activities. You will need to either file the NO! and an erosion control plan summary on-line at www.commerce.wi.gov/sb or submit a completed NO! form and either a plan summary or complete plan to us, with additional fees, or to the certified municipality. THOMAS R KARRELS Page 2 11/21/2007 In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. Inquiries concerning this correspondence may be made to me at the telephone number listed below, or at the address on this letterhead. Sincerely, \. \ ~..._---::::::=- I .c:::~- ~ _.~~~._~ ls:x- John D VanBuecken, P.E. Building Plan Reviewer , Integrated Services (920)492-7727, Monday -Friday 8:00 am - 4:30 pm john.vanbuecken@wisconsin.gov Fee Required $ Fee Received $ Refund Amt $ 440.00 490.00 50.00 cc: John R Anderson, State Building Inspector, (715) 823-2014 , Monday,7:45A.M.-4:30P.M. Ryan Meyers, Oshkosh Truck Corp Proposed Rules: The Wisconsin Division of Safety & Buildings is in the process of adopting the 2006 International Code Council suite of building codes, including the International Existing Buildings Code, with a likely effective date of March 1, 2008. You may view or download the adopted draft of chs. Comm61-65 at www.commerce.wi.f!.ov/SB/SB-CodeDevelopment.htrnl