Loading...
HomeMy WebLinkAboutPlumbing G6-5-1082 . Oct. 21, 1982 Mr. Arnold Henke 1308 Maricopa Dr. Oshkosh, WI 54901 RE: Plumbing Plan Approval for 515 High, 4 Unit Apartment Plan ID #G6.5-1082 Gentlemen: Examination of the plumbing plans and specifications for the abovementioned project has been completed. In accord with Chapter 145, Wisconsin Statutes, and Chapter H62, Administrative Code, the plumbing plan s and specifications are contingent upon compliance with the stipulation noted below: Wisconsin approved 1. Provide trap primers for all traps under stairs. 2. Provide valve as per code. 3. All future plans shall have water s1z1ng calculations. The architect, professional engineer, registered designer, owner or plumbing contractor shall keep, at the construction site, one set of plans bearing the stamp of approval. In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fee shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specification, plan omissions, examination oversight, construction or any damage that may result in or after instal13tion and reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for installing plumber to obtain a plumbing permft from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Sincerly, MARVIN HIGLEY Plumbing Supervisor P. O. BOX 1130 . OSHKOSH. WISCONSIN 54902