HomeMy WebLinkAbout0127985-Plumbing (drain stack; drain)
e
OSHKOSH
ON THE WATER
Job Address 1709 N MAIN ST
CITY OF OSHKOSH
No
127985
PLUMBING PERMIT - APPLICATION AND RECORD
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Owner JEFFREY G SCHMIEDEL Create Date 11/29/2007
Category 410 - Residential-Interior Plan
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Contractor WELLNITZ PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. .Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature Repipe drain stack in basement, add ACW standpipe and repipe kitchen drain.
of Work
Valuation
Size
I
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1502380000
$700.00 Plan Approval
$0.00 Permit Fees
$25.00 0 Permit Voided I
Issued By
Date 11/29/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s ecure any ne sary a provals before starting such activity.
Signature /.. Date ~ - ...2- 9' - 0
Agent/Owner
Address 4810 AMBERWOOD LN
APPLETON
WI 54913 - 7924 Telephone Number (0)231-7390
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.