HomeMy WebLinkAbout0127960-Building (loading dock)
o
OSHKOSH
ON THE WATER
Job Address 2737 HARRISON ST
CITY OF OSHKOSH No 127960
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSHKOSH TRUCK CORP Create Date 11/20/2007
Designer
T -Karrels
Contractor FLUOR BROS CONSTRUCTION CO
Category
211 - Alteration Industrial
Plan ZZ6-2208-1107
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: 2B Size
Rooms Height Ft. o Projection I
- -
Bedrooms Stories Canopies
-
Baths Signs
-
Zoning
Unfinished/Basement
Sq. Ft.
Sq.Ft.
Sq.Ft.
Finished/Living
Garage
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature 'INO/ loading dock~lteratiOns.peiState);\pproved Plans.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
0,000.00 Plan Approval
$0.00 Permit Fee Paid
$418.00 Park Dedication
$0.00
Issued By:
Date 11/27/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1519600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 203 OTTER AVE
OSHKOSH
WI 54901 - 0000
Telephone Number
231-6260
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), yourName and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.