Transmittal Letter
To: David Patek, P.E., Director of Public Works
City of Oshkosh '
215 Church Street
PO Box 1130
Oshkosh,W154903-1130
Date: November 6, 2007 I ProJect No.: 11-382.022
Attention:
RE: Modification of Amendment NO.2 - Sawyer Creek
WE ARE SENDING YOU:
I2l Attached
D Under Separate Cover
D Shop Drawings
D Change Order
D Copy of Letter rw.~C' ','!:5!:;YE"~,'~D;~1
~ J. ~.t, J~.l '\1
D Samples I .
~., ". M, "\fl~' {
II r~ 0 r llJv(
N .
, '~ DEf'COr- PUBUCWOHKS
l.~j}llli.!$Q~t!J[1l!~~...J
D Specifications
D Drawings
D Other:
Copies Date No. Description
2 Original of Revised Page 1 of Amendment No. 2 to the Sawyer
Creek Regional Detention Basin Plan
THESE ARE TRANSMITTED as checked below:
D For approval
D For your use
I2l As requested
D For review and comment
o Approved as submitted
D Approved as noted
D Returned for corrections
D Other
'0 Resubmit _ copies for approval
D Submit _ copies for distribution
D Return _c orrected prints
Remarks:
Please replace the former original Page 1 of this amendment transmitted on 10/10/07 with
the attached revised ori inal
-
II-Ic~ J.eo7
Jln\" A#-~ ^~J 0. <:>\~J ~iJ~
'6""::rv 6!1..~. . -r&o...Jo,> . Signe .
~ fit.,.
~ t <<J <.lMt.. ( ...ff. ikr)
st~ G I S-~~ j(
c.c.
sa.
STRANO
ASSOCIATES, INC.~
ENGINEERS
910 West Wingra Drive
Madison, WI 53715
Phone: 608-251-4843
Fax: 608-251-8655
Office Locations
Madison, WI
Joliet,IL
Louisville, KY
Lexington, KY
Mobile, AL
Columbus, IN
Columbus, OH
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH
www.strand.com
October 10,2007
City of Oshkosh
215 Church Avenue
P.O. Box 1130
Oshkosh, VVI 54903-1130
Attention:
David Patek, P.E., Director of Public VVorks
Re: Agreement for Planning Services-Amendment No.2
Sawyer Creek Regional Detention Basin Plan
This is Amendment No. 2 to the referenced Agreement for Planning Services dated
August 19,2005.
Under Scope of Services:
Item D. Hydraulic Modeling, ADD the following sentence:
"Incorporate the recommended alternative Sawyer Creek outfall hydro graphs from the final
Campbell Creek Stormwater Plan into the HEC-RAS model for Sawyer Creek."
Item E. Alternatives Analysis, DELETE 1 through 7 and replace with the following:
"1. Alternative I-One regional detention basin near the James Road/H\VY 91
intersection under existing conditions. A preliminary grading plan and outlet
structure configuration for this detention basin will be provided based on existing 2-
foot contours provided by OVVNER.
2. Alternative 2-0ne regional detention basin within the city limits under existing
conditions. A preliminary grading plan and outlet structure configuration DDr this
detention basin will be provided based on existing 2- foot contours provided by
OWNER.
3. Alternative 3-0ne regional detention basin near the James Road/HWY 91
intersection coupled with a second regional detention basin just north of the
southwest industrial park expansion and a third regional detention basin within the
city limits under existing conditions. A preliminary grading plan and outlet structure
configuration for these three detention basins will be provided based on existing 2-
foot contours provided by OWNER.
4. Alternative 4-Alternative 1 plus regional detention upstream for future development
upstream.
.;~ "'_ oJ
sa.
STRANO
ASSOCIATES, INC.'!!
ENGINEERS
City of Oshkosh, Wisconsin
Page 2
October 10, 2007
5.
Alternative 5-Alternative 1 plus
development-by-development basis.
a
detention
upstream
on
6. Alternative 6-Alternative 2 plus regional detention upstream for future development
upstream.
7.
Alternative 7-Alternative 2 plus
development -by-development basis.
a
detention
upstream
on
8. Alternative 8-Alternative 3 plus regional detention upstream for future development
upstream.
9.
Alternative 9-Alternative 3 plus
development-by-development basis.
a
detention
upstream
on
10. Alternative 10-Analysis of a single-mix of detention to optimize the downstream
benefit based on detention provided in Alternatives 1 through 9."
Under Compensation, CHANGE the lump sum fee from $90,200 to "$119,700."
REPLACE table with the following:
Field Investigation/Survey
Meetings/Administration
Stormwater Modeling! Analysis
Stormwater Management Plan
Total
$ 6,000
15,160
48,310
50,230
$119,700
Under Schedule, DELETE existing language and REPLACE with:
"The final plan incorporating the Scope of Services herein will be completed by
approximately March 1, 2008."
Under Obligations of OWNER, ADD:
"11. Provide written correspondence from the Wisconsin Department of Natural
Resources regarding all wetlands, navigable waterways, and off-line detention that
may arise out of this Project. This would include all delineations, determinations,
variances, opinions, and permits."
JHL:ebtlR:\Documents\Agreements\Oshkosh, City of (WI)\SawyerCreek.2005-2006\Amd\I -3 82-022.2.doc
.~ ~--
'7f~'_"" .~' '"
sa.
STRANO
ASSOCIATES,INC.@
ENGINEERS
City of Oshkosh, Wisconsin
Page 3
October 10,2007
IN WITNESS WHEREOF the parties hereto have made and executed this Amendment.
ENGINEER:
OWNER:
STRAND ASSOCIATES, INC. CITY OF OSHKOSH
--:77',?",~~ ,,';/DhZ ~~~ '1bJ-7
Roger H. Huchthauseu Dale -' 'a-k - - - Dali
Corporate Secretary 4c-'TI~ ity Manager, '
~~~.U4t-
Pamela R. Ubng Dal~
City Clerk ( I ~ f -
~~ a ~ ((-(t.{":!2.L
Edward A. Nokes Date
Finance Director
J-~7
Date
City' ttomey
JHL:ebt\R: IDocuments\Agreements\Oshkosh, City of (WI)\SawyerCreek.2005-2006\Amd\1_ 3 82-022.2.doc