Loading...
HomeMy WebLinkAboutPW Sawyer Creek Detention Basin Amend #2 sa. STRANO ASSOCIATES, INC." ENGINEERS 910 West Wingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet, IL Lexington, KY Louisville, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH www.strand.com Transmittal Letter To: David Patek, P.E., Director of Public Works City of Oshkosh ' 215 Church Street PO Box 1130 Oshkosh,W154903-1130 Date: November 6, 2007 I ProJect No.: 11-382.022 Attention: RE: Modification of Amendment NO.2 - Sawyer Creek WE ARE SENDING YOU: I2l Attached D Under Separate Cover D Shop Drawings D Change Order D Copy of Letter rw.~C' ','!:5!:;YE"~,'~D;~1 ~ J. ~.t, J~.l '\1 D Samples I . ~., ". M, "\fl~' { II r~ 0 r llJv( N . , '~ DEf'COr- PUBUCWOHKS l.~j}llli.!$Q~t!J[1l!~~...J D Specifications D Drawings D Other: Copies Date No. Description 2 Original of Revised Page 1 of Amendment No. 2 to the Sawyer Creek Regional Detention Basin Plan THESE ARE TRANSMITTED as checked below: D For approval D For your use I2l As requested D For review and comment o Approved as submitted D Approved as noted D Returned for corrections D Other '0 Resubmit _ copies for approval D Submit _ copies for distribution D Return _c orrected prints Remarks: Please replace the former original Page 1 of this amendment transmitted on 10/10/07 with the attached revised ori inal - II-Ic~ J.eo7 Jln\" A#-~ ^~J 0. <:>\~J ~iJ~ '6""::rv 6!1..~. . -r&o...Jo,> . Signe . ~ fit.,. ~ t <<J <.lMt.. ( ...ff. ikr) st~ G I S-~~ j( c.c. sa. STRANO ASSOCIATES, INC.~ ENGINEERS 910 West Wingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet,IL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH www.strand.com October 10,2007 City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, VVI 54903-1130 Attention: David Patek, P.E., Director of Public VVorks Re: Agreement for Planning Services-Amendment No.2 Sawyer Creek Regional Detention Basin Plan This is Amendment No. 2 to the referenced Agreement for Planning Services dated August 19,2005. Under Scope of Services: Item D. Hydraulic Modeling, ADD the following sentence: "Incorporate the recommended alternative Sawyer Creek outfall hydro graphs from the final Campbell Creek Stormwater Plan into the HEC-RAS model for Sawyer Creek." Item E. Alternatives Analysis, DELETE 1 through 7 and replace with the following: "1. Alternative I-One regional detention basin near the James Road/H\VY 91 intersection under existing conditions. A preliminary grading plan and outlet structure configuration for this detention basin will be provided based on existing 2- foot contours provided by OVVNER. 2. Alternative 2-0ne regional detention basin within the city limits under existing conditions. A preliminary grading plan and outlet structure configuration DDr this detention basin will be provided based on existing 2- foot contours provided by OWNER. 3. Alternative 3-0ne regional detention basin near the James Road/HWY 91 intersection coupled with a second regional detention basin just north of the southwest industrial park expansion and a third regional detention basin within the city limits under existing conditions. A preliminary grading plan and outlet structure configuration for these three detention basins will be provided based on existing 2- foot contours provided by OWNER. 4. Alternative 4-Alternative 1 plus regional detention upstream for future development upstream. .;~ "'_ oJ sa. STRANO ASSOCIATES, INC.'!! ENGINEERS City of Oshkosh, Wisconsin Page 2 October 10, 2007 5. Alternative 5-Alternative 1 plus development-by-development basis. a detention upstream on 6. Alternative 6-Alternative 2 plus regional detention upstream for future development upstream. 7. Alternative 7-Alternative 2 plus development -by-development basis. a detention upstream on 8. Alternative 8-Alternative 3 plus regional detention upstream for future development upstream. 9. Alternative 9-Alternative 3 plus development-by-development basis. a detention upstream on 10. Alternative 10-Analysis of a single-mix of detention to optimize the downstream benefit based on detention provided in Alternatives 1 through 9." Under Compensation, CHANGE the lump sum fee from $90,200 to "$119,700." REPLACE table with the following: Field Investigation/Survey Meetings/Administration Stormwater Modeling! Analysis Stormwater Management Plan Total $ 6,000 15,160 48,310 50,230 $119,700 Under Schedule, DELETE existing language and REPLACE with: "The final plan incorporating the Scope of Services herein will be completed by approximately March 1, 2008." Under Obligations of OWNER, ADD: "11. Provide written correspondence from the Wisconsin Department of Natural Resources regarding all wetlands, navigable waterways, and off-line detention that may arise out of this Project. This would include all delineations, determinations, variances, opinions, and permits." JHL:ebtlR:\Documents\Agreements\Oshkosh, City of (WI)\SawyerCreek.2005-2006\Amd\I -3 82-022.2.doc .~ ~-- '7f~'_"" .~' '" sa. STRANO ASSOCIATES,INC.@ ENGINEERS City of Oshkosh, Wisconsin Page 3 October 10,2007 IN WITNESS WHEREOF the parties hereto have made and executed this Amendment. ENGINEER: OWNER: STRAND ASSOCIATES, INC. CITY OF OSHKOSH --:77',?",~~ ,,';/DhZ ~~~ '1bJ-7 Roger H. Huchthauseu Dale -' 'a-k - - - Dali Corporate Secretary 4c-'TI~ ity Manager, ' ~~~.U4t- Pamela R. Ubng Dal~ City Clerk ( I ~ f - ~~ a ~ ((-(t.{":!2.L Edward A. Nokes Date Finance Director J-~7 Date City' ttomey JHL:ebt\R: IDocuments\Agreements\Oshkosh, City of (WI)\SawyerCreek.2005-2006\Amd\1_ 3 82-022.2.doc