HomeMy WebLinkAbout0127929-Building
o
OSHKOSH
ON THE WATER
Job Address 656 N MAIN ST
CITY OF OSHKOSH No 127929
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS HIMARY M STEIN Create Date 11/26/2007
Contractor CRAIG STAPEL
Designer
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size no change
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature I ommerciailApaitment - Repair and insulate first floor ceiling (5/8 X sheetrock), replace 3 entrance doors with ii'me size accessible
of Work oors. Gut and remodel second floor apartment: insulate, drywall, kitchen cabinets, counters, misc finish surfaces.
HV AC Contractor
Plumbing Contractor
UNKNOWN
Plan Approval
$0.00 Permit Fee Paid
$178.00 Park Dedication
$0.00
Issued By:
Date 11/26/2007
Final/O.P. 00100/0000
o Permit Voided I
Parcel Id # 0402260000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this it application within an easement, t e City strongly urges the permit applicant to contact the easement
holder(s) and s cure arfy necessa Q ovals befor. tarting such activity.
Date
Signature ~
Address 908 E PARKWAY AVE
Agent/Owner
OSHKOSH
WI 54901 - 0000 Telephone Number 232-1374
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.