HomeMy WebLinkAbout2007-Building (south wall)
e
OSHKOSH
ON THE WATER
Job Address 1404 S MAIN ST
CITY OF OSHKOSH No 127937
BUILDING PERMIT - APPLICATION AND RECORD
Owner KEPLAR LLC Create Date 11/08/2007
Contractor BAYLAND BUILDINGS INC
Designer
Category
211 - Alteration Industrial Plan Z6-2091-0907
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq. Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Signs
Garage
Baths
Foundation
o Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
. Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature ~ommercialllndustrial/ Modifications tc) South\'Vall to convert into a Fire/Party Wall for purposes of creating two separate
of Work Buildings/Parcels.
HV AC Contractor
Plumbing Contractor
Fees: Valuati
$ 0,000.00 Plan Approval
$0.00 Permit Fee Paid
$88.00 Park Dedication
$0.00
Issued By:
Date 11/26/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0304740000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit IicatiO.,.n..tthin an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to see e y necerry approv~efore starting such activity. .. .
Signature __..__" . {j/ 4. Date // - .,2 (, - CJ 7
Agent/Owner
Address PO BOX 13571
GREEN BAY
WI 54307 - 3571 Telephone Number 920-498-9300
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.