Loading...
HomeMy WebLinkAbout2007-Building (south wall) e OSHKOSH ON THE WATER Job Address 1404 S MAIN ST CITY OF OSHKOSH No 127937 BUILDING PERMIT - APPLICATION AND RECORD Owner KEPLAR LLC Create Date 11/08/2007 Contractor BAYLAND BUILDINGS INC Designer Category 211 - Alteration Industrial Plan Z6-2091-0907 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq. Ft. Sq.Ft. Bedrooms Stories Canopies Signs Garage Baths Foundation o Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood . Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~ommercialllndustrial/ Modifications tc) South\'Vall to convert into a Fire/Party Wall for purposes of creating two separate of Work Buildings/Parcels. HV AC Contractor Plumbing Contractor Fees: Valuati $ 0,000.00 Plan Approval $0.00 Permit Fee Paid $88.00 Park Dedication $0.00 Issued By: Date 11/26/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0304740000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit IicatiO.,.n..tthin an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see e y necerry approv~efore starting such activity. .. . Signature __..__" . {j/ 4. Date // - .,2 (, - CJ 7 Agent/Owner Address PO BOX 13571 GREEN BAY WI 54307 - 3571 Telephone Number 920-498-9300 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.