Loading...
HomeMy WebLinkAboutPlumbing ZZ4-287-1107-P ~ e OSHKOSH ON THE WATER Oshkosh Plan Approval Form Job Address 631 HAZEL ST Approval Number 2205 Approval Type Plumbing Submitter's Name PAT O'NEILL Address Plan ZZ4-287-1107-P Owner Name HEALTH CARE REIT INC Address 1 SEA GATE 1500 TOLEDO OH 43603 o Type of Plan BUILDING INTERIOR CONVERSION TO APARTMENTS Fee $480.00 Date Received 11/19/2007 Date Approved 11/26/2007 't:.;~ ~ OJHKOJH City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX ..~ ON THE WATER November 26, 2007 0' Neill Enterprises Inc. 522 W 6th Ave. Oshkosh, WI. 54902 Ref: Plumbing Plan Approval: Bella Vista-Interior Plumbing 631 Hazel St, Oshkosh, WI Plan ID# ZZ4-287-1107-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans. and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. All plumbing fixtures, appliances and appurtenances with 3/8" or larger inlet openings and with solenoid actuated quick closing valves shall be provided with water hammer arrestors. COMM 82.40(8)(f) 2. Water supply systems and the connection of each plumbing fixture, piece of equipment, appliance or nonpotable water supply piping system shall be designed, installed and maintained in such a manner to prevent the contamination of water supplies by means of cross connections. COMM 82.41(3) 3. Air Admittance Valves must be installed in accordance with the manufacturer's printed instructions, system approval, plan approval and Wisconsin Administrative Code. AA V's must hold a pressure equal to one-inch water column for five minutes after installation or immediately prior to installation. 4. Piping hangers and anchors shall be securely attached to the building's structure at intervals to support the piping and its contents, but not at intervals greater than those specified in Table 82.60. COMM 82.60(2)(a) 5. All changes or modifications made to plumbing plans and specifications, which have been granted approval, shall be submitted to the Department or Agent for examination. All changes and modifications shall be approved in writing prior to the installation of the plumbing per COMM 82.20(8). Available incoming water pressure shall be field verified in order to properly size water distribution piping, water calculation worksheet submitted shows an incoming pressure of 71 PSI with an "A" value of 6. In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. '9" ~; In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfully, Paul Wolf, Plumbing Inspector