HomeMy WebLinkAboutEmail-9/4/02Inspection follow-up
Benner. Kevin
From:
Sent:
To:
Cc:
doug. thurber@ps.ge.com
Wednesday, September 04,20027:19 AM
philip.plowman@ps.ge.com
tony.neely@ps.ge.com; barry. weinbren ner@ps.ge.com; kbenner@ci.oshkosh.wi.us
Phill,
On Aug.29, 2002 GE Power Systems/AC Compressor was inspected by the
city of Oshkosh. Kevin Benner,
Brian Noe, and Douglas Thurber was present for the inspection. The
following is a list of violations needing
correction from Vos Electric. You will need to forward this list to
your connection at Vos.
1. Two wires under one lug on office trans former
2. Equipment ground sized to small on office transformer
3. Boxes not anchored under floor in computer room
4. Flex conduit not anchored in computer room
5. Two wires under single lug on 350 amp breaker and 400 amp panel
f~. 6. Ground not bonded in pull boxes
7. LB cover missing in break room
8. Class 2 and power wires not seperated in fire suppression system
in the computer room
9. Box cover missing at employee entrance
10. Kevin requested pull tension calculations from Vos for the 350
amp circuit for the compressors
r'
1
> 11. Exit li~ht burnt out in maln'tenance
> (Doug)
>
> 12. Need to add exit lights in front office
(> (Barry)
\ >
> 13. Need fire extinguisher installed in second floor storage
> (Cassie)
>
> 14. Need ground and bonding in the oil house
> (Doug)
>
> 15. Bond ground to conduit panel # 50
> (Doug)
>
> 16. Covers missing on office partitions
> (Barry)
>
> 17. Add exit signs in office
> (Barry)
>
> 18. Turn exit sign in office NE corner 90deg.
> (Barry)
>
> 19. Remove old class 2 wires in office
> (Barry)
>
> 20. Separate class 2 wires from power in office partitions
> (Barry)
>
>
>
('>
/>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
2
Benner. Kevin
From:
('\Sent:
To:
Cc:
doug. thurber@ps.ge.com
Wednesday, September 04, 2002 7:54 AM
barry. weinbrenner@ps.ge.com
tony. neely@ps.ge.com; kbenner@ci.oshkosh.wi.us
Barry ,
Outstanding issues from inspection on Aug.29.
1. Clearance on disconnect by pumping station (Ogden Plumbing) We
were not going to take action on this item
until the pumping station is operational.
2. Paint Booth contractor needs permit and contractors license.
3. Third party listing on Hawkinson dryer.
4. Exhaut Fan on roof has exposed wires (Central Temp)
5. Wires run in exhaust plenum (GE Power Systems)
6. Misc. knockout enclosures ( GE Power Systems)
7. Post drawings of electrical distribution locations (GE Power
Systems)
r 8. Evaluate our use of extension cords and hard wire permanent
applications. ie portable parts cleaner in
assembly.
9. Label entire electrical system (GE Power Systems)
Please advise on how to handle Centrals violation on the fan.
Douglas
r'
1
Benner. Kevin
From:
'" Sent:
, To:
Subject:
doug. thurber@ps.ge.com
Wednesday, September 04, 2002 7:59 AM
Kbenner@ci.oshkosh.wi.us
breaker test results
Kevin,
I have requested the test results for the 3000 amp main breaker. I
will post the results when i receive them from
GE.
Douglas
('
r
1