Loading...
HomeMy WebLinkAboutEmail-9/4/02Inspection follow-up Benner. Kevin From: Sent: To: Cc: doug. thurber@ps.ge.com Wednesday, September 04,20027:19 AM philip.plowman@ps.ge.com tony.neely@ps.ge.com; barry. weinbren ner@ps.ge.com; kbenner@ci.oshkosh.wi.us Phill, On Aug.29, 2002 GE Power Systems/AC Compressor was inspected by the city of Oshkosh. Kevin Benner, Brian Noe, and Douglas Thurber was present for the inspection. The following is a list of violations needing correction from Vos Electric. You will need to forward this list to your connection at Vos. 1. Two wires under one lug on office trans former 2. Equipment ground sized to small on office transformer 3. Boxes not anchored under floor in computer room 4. Flex conduit not anchored in computer room 5. Two wires under single lug on 350 amp breaker and 400 amp panel f~. 6. Ground not bonded in pull boxes 7. LB cover missing in break room 8. Class 2 and power wires not seperated in fire suppression system in the computer room 9. Box cover missing at employee entrance 10. Kevin requested pull tension calculations from Vos for the 350 amp circuit for the compressors r' 1 > 11. Exit li~ht burnt out in maln'tenance > (Doug) > > 12. Need to add exit lights in front office (> (Barry) \ > > 13. Need fire extinguisher installed in second floor storage > (Cassie) > > 14. Need ground and bonding in the oil house > (Doug) > > 15. Bond ground to conduit panel # 50 > (Doug) > > 16. Covers missing on office partitions > (Barry) > > 17. Add exit signs in office > (Barry) > > 18. Turn exit sign in office NE corner 90deg. > (Barry) > > 19. Remove old class 2 wires in office > (Barry) > > 20. Separate class 2 wires from power in office partitions > (Barry) > > > ('> /> > > > > > > > > > > > > > > > > > > > > > 2 Benner. Kevin From: ('\Sent: To: Cc: doug. thurber@ps.ge.com Wednesday, September 04, 2002 7:54 AM barry. weinbrenner@ps.ge.com tony. neely@ps.ge.com; kbenner@ci.oshkosh.wi.us Barry , Outstanding issues from inspection on Aug.29. 1. Clearance on disconnect by pumping station (Ogden Plumbing) We were not going to take action on this item until the pumping station is operational. 2. Paint Booth contractor needs permit and contractors license. 3. Third party listing on Hawkinson dryer. 4. Exhaut Fan on roof has exposed wires (Central Temp) 5. Wires run in exhaust plenum (GE Power Systems) 6. Misc. knockout enclosures ( GE Power Systems) 7. Post drawings of electrical distribution locations (GE Power Systems) r 8. Evaluate our use of extension cords and hard wire permanent applications. ie portable parts cleaner in assembly. 9. Label entire electrical system (GE Power Systems) Please advise on how to handle Centrals violation on the fan. Douglas r' 1 Benner. Kevin From: '" Sent: , To: Subject: doug. thurber@ps.ge.com Wednesday, September 04, 2002 7:59 AM Kbenner@ci.oshkosh.wi.us breaker test results Kevin, I have requested the test results for the 3000 amp main breaker. I will post the results when i receive them from GE. Douglas (' r 1