Loading...
HomeMy WebLinkAbout0127861-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 280-298 OHIO ST Contractor ZILLGES EXCAVATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work PLUMBING PERMIT - APPLICATION AND RECORD CITY OF OSHKOSH No 127861 Owner BRIDGEVIEW HOLDINGS LLC Create Date 10/24/2007 Plan Category 430 - Industrial-Exterior (laterals) Coffee Maker Int Grease Trap 3 Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Install 1 curb inlet and 2 yard drains for parking area expansion and building addition from 10" extension from private storm main on property and 6" lateral to be installed for interior storm drains. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 6" Plastic Lateral 1 New Water Service Parcel Id # 0600021200 Valuation Issued By Shower Water Sottner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp $7,000.00 $0.00 $71.00 D Permit Voided I Date 11/16/2007 Permit Fees Plan Approval In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1800 FOUNTAIN AVE OSHKOSH WI 54904 - 0000 Telephone Number 376-1005 To schedule inspections please call the Inspection Request line at 236-5128 n'oting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.