Loading...
HomeMy WebLinkAbout2007-Plumbing (laundry tray) G OSHKOSH ON THE WATER Job Address 370 WYLDEWOOD DR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 127881 Contractor SAMMONS PLUMBING Category 41 0-=_ Re~Elenti~~!nterior______~_ Shower Floor Drain Lndry Tray Disposal Dishwasher Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature !SFRTTi1sl-affTiundry-rray."**OEBrfACCf**:--- of Work Valuation Issued By Sump Pump Classrm Sink Breakrm Sink Ejector/Grind I I i l_____ Owner RITA M GEAR TRUST Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Create Date 11/19/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Sanitary Sewer I ____________.___________.-.J Storm Sewer Water Service Size Material Type # Conn. Type Parcelld # 1632004000 $600.00 Plan Approval -~--(J;;~ _ _ ~.9.QO Permit Fees $25.00 Permit Voided Date 11/19/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231:~8~0_ ..._._..... ___ ..._ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.