HomeMy WebLinkAbout0127878-Plumbing (water heater)
e CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1007 E TENNESSEE AVE Owner MARY ANN DEBEHNKE
No 127878
Create Date 11/19/2007
Category 411 - Re~~e_~~I:YJater !:'~~~~________ Plan
Contractor SAMMONS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower Water Softner Wait. St. Shamp Sink Coffee Maker
Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv Sink Soda Disp
~FR / Replace'gas water'healer:**DEBIT Acct**.-
I
I
I
I
L_~__
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1510250000
w,_~cog Permit Fees
_ $2?~QQ O~~r~J~~~~!'9J
Valuation $600.00 Plan Approval
Issued By ----U~<J
Date 11/19/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE
OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.